Jerome Mayhew MP: speeches

475 published records · newest first.

Speeches

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    From the Government’s perspective, yes, it would be, but we have recent experience—this is a slight tangent, but I hope the Committee will bear with me—of Governments passing key objectives to achieve long out in the distance. I am thinking of the Climate Change Act 2008 and its objective of achieving net zero by 2050. That all sounds good in 2008, but in my view it does not achieve the objective of balancing democratic accountability with a long-term direction. Look, we are slightly arguing about how many angels can dance on the head of a pin. Both parties agree that we want a long-term strategy, but should it be 15 years or 30 years? In a sense it does not really matter, but it needs to be significantly beyond the current five-year control period. Amendment 137, also in the name of the hon. Member for Didcot and Wantage, would require the strategy to set out a long-term strategy for supporting rural communities in accessing rail travel and co-operating with transport authorities to integrate travel options. It is a worthy objective, although we would want to go further if extending clause 15(1) beyond the railway network and railway services—the catch-all descriptors. The amendment is slightly a halfway house, but it nevertheless points in the right direction, and in so far as it makes progress, we are happy to support it. Amendment 207, again in the name of the Liberal Democrat spokesman, would introduce a requirement for the rail strategy to consider the rail network as a whole, and the relationship between integrated timetables and infrastructure enhancement to enable such integration. There is perhaps a better solution tabled in the name of my hon. Friend the Member for Runnymede and Weybridge (Dr Spencer), who is engaged somewhere else as we speak—there may be a better way to achieve that outcome. Amendment 224, which I tabled, would add paragraph (c) to clause 15(1). As drafted, the provision requires the Secretary of State to “prepare and publish a document that sets out” her “long term strategy for…(a) the development and use of the railway network in Great Britain, and…(b) the railway services that the Secretary of State wishes to see provided in Great Britain.” This important amendment would add a focus on “rail freight network usage”. Rail freight does, in a sense, come under “railway services”, but we need to give it particular focus, and the amendment offers a good opportunity to do so. Amendment 25, which is also in my name, would require the rail strategy to remain in place “for a minimum of three control periods”, which would be 15 years. We have already debated whether it should be 15 or 30 years, but the provision would provide the industry with a genuine long-term strategy and mean that that strategy is less likely to be used as a political football when Governments come and go. The period of 15 years is short enough to have political weight, but long enough to give the certainty that the industry also seeks. I will briefly mention amendment 260, which was tabled by my hon. Friend the Member for Runnymede and Weybridge. I know that the subject is close to my hon. Friend’s heart because he has told me so, multiple times.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    I beg to move amendment 120, in schedule 2, page 60, line 36, leave out “may” and insert “must”. This amendment would require the statement of objectives to contain standards to be achieved when carrying on activities in relation to railways and railway services.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    The Minister refers to clause 18(2)(e), which states: “They must exercise the functions… in the manner best calculated to be in the public interest”. Can the Minister not see that GBR’s assessment of what is in the public interest could very well be what it considers to be in its own interest, because it is a public body? The provision would allow GBR to prioritise its own interests, such as the increased receipt of revenue from third-party operators, at the expense of the competition. That is not the safeguard that the Minister says it is, is it?

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    We now turn to paragraph 4 of schedule 2, which deals with the business plan and approval by the Secretary of State. To receive public funding under paragraph 4, GBR is required to include in its business plan an explanation of how it will meet the objectives set by the Secretary of State. Amendment 124 seeks to strengthen this obligation by requiring GBR to set meaningful KPIs against which its performance and meeting its statutory duties—as set out in clause 18, which we will come to in a bit—can be measured. We had the saga of the missing licence; now we have the saga of the missing KPIs—and 19 other documents. This is important, given the absence of any direction from the Government on KPIs, despite being repeatedly requested on the Floor of the House over a number of months. The only response from the Government as a result of that probing is that they will be “robust”, whatever that means, hence the need for amendment 124. Amendments 125 to 128 would strengthen GBR’s focus on minimising the cost to the taxpayer and increasing the role of the Office of Rail and Road to make sure that that happens. Amendment 125 would require an express focus on how plans will minimise costs to the taxpayer, which is too often overlooked—the Bill makes hardly any reference to value for money. The taxpayer is ignored entirely. This amendment would make it a legal requirement to address that and would—under the maxim that “you get what you measure”—drive behaviour. Amendment 127 would require the Office of Rail and Road to provide an assessment of whether GBR’s plans to minimise costs to the taxpayer are, in fact, likely to do so. That would be undertaken before the Office of Rail and Road approves the business plan. Again, this is about driving behaviour through focus and making sure that the taxpayer is not forgotten in the deliberations between nationalised Great British Railways and civil servants at the Department for Transport. Finally, amendment 128 would require GBR to publish its full business plan, save for commercially sensitive sections, which they should of course have a carve-out from displaying to their potential competitors—although most of their competitors have been designed out under the wording of the Bill. Amendment 128 would welcome transparency, which—given the huge amount of public funding that the organisation currently requires and no doubt will continue to require—is necessary, so that the public can see how their money is being spent, and whether the organisation is focused on driving down the cost to the taxpayer and driving up value for money. I commend all the amendments to the Minister.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    I beg to move amendment 124, in schedule 2, page 62, line 9, at end insert— “(d) measurable performance indicators for each statutory duty listed in Section 18.” This amendment would require the business plan to include measurable performance indicators for GBR’s duties.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Amendments 120 to 123 aim to strengthen GBR’s value for money and wider performance duties. As drafted, paragraph 2(2) in schedule 2 only gives the Secretary of State the option of tying performance objectives to granting public funds. The performance objectives should be at the core of the granting of funds, so amendments 120 and 121 seek to change the wording of the current drafting by replacing “may” with “must”. In other words, they would make it clear that it is not an option but core to the application of the process, and should therefore be mandatory. Amendment 122 would make it clear that Great British Railways should aim to increase passenger services. I do not know why this has become such a hot topic; I would have thought it would be obvious—I was about to use unparliamentary language for a moment there. Increasing passenger services should obviously form part of the functions and aspirations of GBR, and that should be included on the face of the Bill. It should be clear that GBR aims to increase passenger services, not just freight. In addition, the list of objectives in the schedule is missing a specific objective on productivities or efficiency, which amendment 123 would add. This series of simple amendments seek to perfect the currently imperfect drafting, to put performance at the heart of the Bill and to recognise that the pursuit of increased passenger numbers should be a key objective of GBR, in addition to its focus on growing rail freight, which we all agree with.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    I listened with interest to the explanation the Minister gave and his request that the amendment be withdrawn. I was particularly interested to hear him describe the role of the ORR as a “trusted expert adviser”. In my submission, when we have GBR as the player and referee in many of the areas it will be active in, with a designed-in conflict of interest, we need more than a trusted expert adviser to hold the Government and GBR to account; we need an independent regulator. That is exactly what the ORR currently is. I intend to press amendment 233 to a vote and, dependent on the outcome, I will not proceed to press amendments 110, 111, 112, 118, 114 and 115 as they address similar wording in other parts of the Bill. However,but I will seek to press amendment 126 to a vote if we get the opportunity to do so this afternoon. Question put , That the amendment be made.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Clause 12 is an enabling clause. It is very short and merely refers to schedule 2, so I make no representations to change it and shall not seek to divide the Committee on it.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    I beg to move amendment 119, in schedule 2, page 60, line 2, at end insert— “(1A) The date specified in section 1(d) must be at least 24 months before the start of the funding period.” This amendment would ensure the Secretary of State has to notify the ORR and GBR of the amount of financial assistance for the next funding period at least two years before that funding period is due to start.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Yes, repeatedly, which is great, because my hon. Friend is absolutely fighting for his constituency and his constituents. He has told me of a repeated trouble that communities experience when a level crossing closes very frequently and for long periods with no regard to the economic impact of that on the town in which it is based. That can cause long periods of tailbacks, but there is no consideration of that when the usage of the piece of line is set, and the Bill, as drafted, makes no provision for GBR even to take that problem into account. Amendment 260 would insert clause 15(2A), which states that the “rail strategy must include a strategy for level crossings (“the level crossings strategy”)”, and clause 15(2B), which states: “The level crossing strategy must set out an assessment of the impact of level crossings on the economy and community of the area in which the level crossing is situated, for the purpose of reducing disruption caused by level crossings.” That is actually a very sensible point, because it recognises that the railway does not impact just trains. If a level crossing temporarily closes arterial routes, there is an impact on other modes of transport, so it would be sensible for a strategy to take into account the full impact of the changes that the Secretary of State has in mind. Amendment 261, which my hon. Friend the Member for Runnymede and Weybridge also tabled, would insert an alternative subsection (2A) in clause 15, stating: “The rail strategy must include an assessment” of “the ability of passengers to change between…main line rail services” and from rail services to “other modes of public transport.” The amendment would also provide that the “assessment under subsection (2A) must consider how to reduce delays and disruption to end-to-end journeys involving a change between rail services, or between rail services and other modes of public transport.” This is, again, my hon. Friend the Member for Runnymede and Weybridge standing up for his constituents and the particular issues that they face with the co-ordination of services. Having heard the experience of Mayor Burnham with the Bee Network in Greater Manchester, the Committee could argue that the increased integration of all modes of transport should properly be a focus of GBR, and the amendment would apply that integration to areas that are not mayoral combined authorities. Later in Committee, we will consider an amendment that seeks to extend the same courtesies to local transport authorities as the Bill extends to mayoral combined authorities, and I know that my hon. Friend the Member for South West Devon will be keen to speak to that. Liberal Democrat amendment 135, which was tabled by the hon. Member for Didcot and Wantage, would require the Secretary of State to make an international rail strategy part of the Government’s long-term rail strategy. That would specifically look to support new routes and operators, and increase channel tunnel and London St Pancras high-speed rail capacity.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    I am grateful for that clarification, but although the Minister may share that ambition, he is not choosing to do anything about it. Having said that, I said I was not going to press the amendments to a vote and I will not. I beg to ask leave to withdraw the amendment. Amendment, by leave, withdrawn.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Clause 15 requires the Secretary of State to publish a document that sets out the long-term strategy for the railway, which we welcome, after consulting with Welsh Ministers and the passenger watchdog. The Secretary of State must keep the strategy under review and publish any revisions. The clause does not provide any detail, which is part of the problem. The industry is in the dark now, and it will still be in the dark if the Bill ever becomes law. There is no draft prepared. There is no indication of the direction of travel. There is just subsection (4), which is very limited. All it says is: “(4) The Secretary of State— (a) must keep the rail strategy under review, and (b) may revise or replace it.” Well, with what and when? We are in trouble here, with no direct reference to even the development of rail freight, which we have seen in other parts of the Bill is apparently in the Government’s mind. Amendment 224 would serve to correct that by making specific reference to rail freight. More widely, the Government have missed an opportunity to set clear targets for the strategy to achieve. Colleagues will know from the debate on clause 3 that we have already tried to amend the Bill to assist with that. Our purpose clause, new clause 1, would have set a clear direction, and new clause 2 would have set KPIs for what the strategy should achieve. That would have helped to inform our set of amendments to clause 15. We are told that Great British Railways should be the guiding mind, so our approach is that GBR will implement the long-term strategy for rail, based on the Secretary of State’s long-term priorities for the railways. GBR is intended to be the stand-alone expert implementer of the development of the railway. The priorities are set out by the Secretary of State through the licence in schedule 1, access to funding in schedule 2 and the long-term rail strategy. All recognise that the political cycle and control periods are far too short for rail infrastructure projects. The industry really needs more predictable forward views. There is inevitably an uncomfortable fit between the needs of democracy and the political cycle—political views change with general elections and sometimes even between them—and the long-term investment certainty that large projects need. There is currently no indication of how long term the strategy will be, or even what it will seek to achieve. Amendments 24 and 25, which we debated with clause 13 but would also affect clause 15—I do not seek to repeat the debate, but I wish to mention the impact that they would have—seek to address those failings by requiring the rail strategy to be geared towards enabling GBR to meet its key performance indicators. Without the amendments, the clause will set out a long-term strategy that includes no requirement to set clear growth targets for passenger numbers or freight use, meaning that there will be no measurable outcomes or performance metrics. I intend to seek to divide the Committee on those amendments when the time comes. The Liberal Democrats’ amendment 134 would ensure that the rail strategy covers a 30-year period. That is logical given the infrastructure life cycle, and any timeframe is, by its nature, arbitrary, but I have to say that 30 years feels on the long side, given the political cycle of four or five years. I wish the hon. Member for Didcot and Wantage well and we should be having a stab at setting out what long term actually means, but that is why we have tabled an amendment that would set the period at 15 years. That would be long enough to show the direction of travel, as he has in mind, but short enough to have some sense of connection between the political cycle and the objectives of the strategy. We may have a difference of opinion, but we are pointing in the same direction.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    So here we are: this is the eminently sensible approach to providing funding for the ORR to continue its operations as a safety regulator. Clause 14 allows the Office of Rail and Road to require GBR to pay a levy to the ORR for performing its non-safety railway functions. That provides the ORR with a legally guaranteed funding source independent of the Secretary of State or Government. The provision aims to provide the ORR with a stable and predictable funding stream that will enable it to plan and carry out its activities. Those were remarkably similar words to the ones used by the Minister—I wonder why! What I have described replaces the current system under which the ORR requires Network Rail to pay a fee for it to perform its non-safety functions via the process set out in the Network Rail licence. The ORR, as we all know, is an independent regulator, so decisions on its funding should be kept separate from organisations that have a vested interest in its decisions, which is why GBR, despite paying the levy, will not determine the amount. The amount is agreed between the ORR and the Treasury and then provided by GBR through this levy. This is one of the few clauses through which the Bill is not actively diminishing the role of the ORR. Instead, it provides the ORR with a legally guaranteed funding source, independent of the Secretary of State or Government—save, obviously, for its negotiations with the Treasury. The aim of that is to provide the ORR with a stable and predictable funding stream that will allow it to plan and carry out its duties successfully. That duty already exists in the Network Rail obligation, as I have already mentioned. I am glad to see from the Government’s explanatory notes on the clause that GBR will not determine the amount of the levy, which will be agreed between the Treasury and the ORR. It seems that the Government do understand the concept of partiality and bias, but are prepared to admit that only when it comes to certain clauses in the Bill.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    GBR may plan on a five year basis, but it is not the same five years, is it?

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Our amendments in this group develop the theme that I spoke about in the debate on the last group. We have tabled two small probing amendments to challenge the stop-start nature of funding under the current control period. Amendment 119 would insert the following new paragraph (1A) into schedule 2: “The date specified in section 1(d)”— which, to paraphrase, refers to the funding agreement for a control period— “must be at least 24 months before the start of the funding period.” Amendment 129 would insert the following new subparagraph (6A): “The Secretary of State may not, however, vary the financial assistance provided to Great British Railways”.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    We have heard with interest what the Minister has to say, but I am wholly unpersuaded that he is adequately reflecting the needs of the industry, so I will seek to press amendment 120 to a Division. Question put, That the amendment be made.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Mr Western, you get what you measure. We on this side of the Committee are very keen that we measure the level of involvement for the taxpayer and that we do our best to look after the taxpayer in the design of this structure, so I intend to press all the amendments.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Thank you, Mr Western, and for agreeing to be in the Chair this afternoon. We are part-way through consideration of the schedule, with a degree of overlap: amendment 109 was selected in a separate group to this one, although its wording is intricately linked to that of amendments 110 to 116. I shall try to minimise the degree of repetition for all concerned. The amendments in this group seek to constrain the Secretary of State’s ability to modify the licence of Great British Railways without first seeking consent from the Office of Rail and Road and the passengers’ council. The Government’s strategy is for the Bill to be the legislative shell for the creation of GBR. Crucial matters of detail, such as the licence under which GBR will operate, together with important long-term strategies, business plans, targets and so on, which we have mentioned more than once in our deliberations so far, are separate from the Bill. That detail matters and deserves proper scrutiny by this Committee and elsewhere in the Houses of Parliament. When the Rail Minister and his officials appeared before the Transport Committee on 7 January, Members took several attempts to secure an assurance that the draft licence would be published before Parliament completes scrutiny of the Bill, albeit without a specific date set. It is therefore important to include in the Bill stronger checks and balances than exist now, and that is the purpose of amendments 110 to 115. At present, the Bill merely requires the Secretary of State to consult the ORR. Legally, that is of course very weak and, after such consultation, the Secretary of State may simply ignore whatever it is that the ORR comes up with. Amendments 110 to 112 therefore require the Secretary of State to obtain the Office of Rail and Road’s agreement for the licence to be issued, and amendments 113 to 115 require the Office of Rail and Road’s agreement for the licence to be modified. In addition, modification of the licence requirements would need consent from the new passenger watchdog. If the passenger watchdog is to be as powerful in championing the interests of passengers as the Government claim they want it to be, it requires proper powers that go beyond an invitation to be consulted. That leads me to amendment 118, which would leave out line 6 on page 56 of the Bill and would strengthen the right of the ORR to grant a licence to a non-GBR operator. The schedule contains important powers for the Office of Rail and Road to issue licences to operators other than GBR to operate services on the network. However, proposed new section 8(5)(a) in paragraph 3 of the schedule gives the trump card to the Secretary of State, who must consent to the granting of such a licence. Why is that power of veto required? Perhaps the Minister will explain when he responds. If the Government wish to reduce their involvement in the day-to-day running of the railways and the Office of Rail and Road deems that an application from a non-GBR operator meets all the requirements and conditions set out in the Bill, why do the Government think it necessary to have that overriding power? It does not appear to make sense. Amendment 118 would remove that power of veto. The group of amendments, together, would require the Secretary of State to obtain a formal recommendation from the Office of Rail and Road, and would require that the GBR licence adequately ensures that licence obligations relating to safety and standards are not compromised or undermined. The amendments would ensure that, as GBR is granted new responsibilities by the licence, it continues to be subject to safety standards obligations that are in the licence issued by the Office of Rail and Road to the current infrastructure manager, Network Rail. Such licence obligations go beyond obligations under the Railways and Other Guided Transport Systems (Safety) Regulations 2006—which are called ROGS for obvious reasons—and would require Great British Railways to participate in the industry’s collaborative structures around collective decision making, managed by the Rail Safety and Standards Board, and comply with safety and interoperability standards set collectively by the sector, including for freight and supply chain. For those reasons, this group of amendments, taken as a whole, would provide important strengthening of the role of the ORR. I look forward to hearing the Minister’s response.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    I beg to move amendment 22, in clause 13, page 7, line 22, leave out “as it thinks fit” and insert “as are reasonable”. This amendment would ensure Great British Railways only charges what is reasonable for provision of services in circumstances where it is a monopoly supplier.

  • 27 Jan 2026 · Railways Bill (Sixth sitting) · Hansard source
    More

    Thank you, Mr Western, for allowing me a second bite at the cherry. I misdirected myself in dealing just with clause 12 in itself, rather than the new clauses in the group. A forward view of funding certainty is key to stopping the stop-start approach to infrastructure funding. The Committee has received plenty of evidence from the industry—both in written evidence and in the oral evidence we heard on Tuesday last week—that this is a major concern. The date in schedule 2(1)(d) is therefore important, and needs to be a minimum of two years prior to the start of the next five-year funding period. That is because, given that we currently have five-year control periods, funding certainty decreases in the run-up to the end of one control period and the beginning of the other and, as a result, the amount of work undertaken and committed to by Network Rail decreases proportionately. We therefore get a wind-down of activity, with specialist staff being laid off by the supply industry, before it all grinds up a gear at the beginning of the next control period. We end up with a bell curve of activity. We have heard strong evidence—I will read some out in a moment—about how that uncertainty disrupts the ability of the supply sector to service Network Rail and its infrastructure development plans efficiently. It does two pretty terrible things: first, it drives up costs for Network Rail and therefore for the taxpayer, and secondly, it means that less work gets done per pound. It is expensive and it takes longer. In written evidence to the Transport Committee, the Rail Forum states: “The Bill states in Schedule 2 Part 1 that the SoS can ‘vary the financial assistance’ previously agreed as part of the GBR five-yearly settlement during the five-year term. This flies in the face of providing the stability that the Transport Committee was seeking to address through the ‘Rail investment pipelines: ending boom and bust’ inquiry earlier this year. Re-opening of the settlement should only be allowed in very exceptional circumstances that should be explicit in the legislation.” Why has the Minister moved away from the position that was previously articulated? Why is the sanctity of the funding settlement within a five-year control period—which has been, albeit imperfect, so valuable for the industry—actively removed by schedule 2? To put it another way, why is the Secretary of State being granted new powers to vary the financial settlement without notice? The Rail Industry Association, which represents the supply sector for the railways, states: “The railway, and rail supply businesses, need stable funding to be able to plan effectively and be efficient. Changes to the Control Period style five-year infrastructure funding settlement (Schedule 2) undermine this and amplify the uncertainty already faced by suppliers. RIA and our members are very concerned the current Bill drafting allows the Secretary of State for Transport to remove railway funding mid-period, at no notice and with very limited transparency over the impact, for example, on safety, performance or efficiency. We disagree with the principle that the Secretary of State should be able to remove funding mid-period. Stable multi-year funding settlements are a longstanding principle for infrastructure networks because short-notice funding changes reduce the efficiency of spending and make it harder for suppliers to plan ahead with any confidence. Supply chain confidence in the UK rail market is already historically low with 64% believing the rail market will contract in 2026 and 62% freezing recruitment or reducing headcount (over one in three business leaders plan to lay off staff in 2026), according to a RIA-commissioned Savanta survey of rail business leaders. There is…currently already a lack of full work visibility to the end of the current Control Period, which completes in March 2029, and companies are now repositioning themselves away from rail to target other industrial sectors in the UK and overseas rail markets—the ability for the Secretary of State to remove funding would clearly exacerbate this situation…Concerningly, even on its own terms Schedule 2 does not require transparency over the impacts on efficiency, performance and safety if there are changes within a funding period and longer-term.” Mr Western, you cannot tell me you agree that that is a very troubling statement from the industry, but I am sure you do agree, or are likely to. The difficulties with the current system are only going to be exacerbated by the proposed changes under schedule 2. The statement of funds will indicate what the Secretary of State “reasonably considers may be…available”. That gives no certainty of funding, which is a key concern of the sector. It would be a backward step from the status quo. Paragraph 4(3)(c) of schedule 2 contains no focus on minimising the cost for the taxpayer, but merely refers to “how Great British Railways proposes to meet those costs.” Paragraph 4(5)(b) refers only to “good value for money” and not to good value for money for the taxpayer. Under paragraph 4(7)(a), regarding the business plan, Great British Railways could retain a huge amount of information from potential open access operators, thereby preventing a level playing field. Finally, paragraph 7(3) removes the whole point of funding periods, which is to provide funding certainty for five years. On its own, that provision removes that funding certainty—which is obviously a backward step. The RIA has stated: “The railway has benefited from 5-year funding settlements for infrastructure for over 30 years, but the legislation proposes that the Transport Secretary will be able to reopen these at any time without consultation. Any deviation from 5-year funding stability risks increased future costs for taxpayers and a deteriorating experience for passengers.”

  • 27 Jan 2026 · Railways Bill (Fifth sitting) · Hansard source
    More

    The Committee will be pleased to hear that I am not going to reheat my arguments on clause 7, but we have not yet discussed clause 8. The arguments inevitably mirror each other to a degree, because clause 8 in the main seeks to extend the provisions of clause 7 to Scottish Ministers. Clause 8 will grant Ministers in Scotland the power to issue and publish directions to GBR—so far, so similar—and GBR will be required to comply with those directions. However, the Secretary of State has ensured that they will have the ability to remove a direction of Scottish Ministers where it is inconsistent with her directions. The clause requires the Secretary of State to consult Ministers in Scotland before revoking and must publish any revocations. The clause suffers from the same issues as clause 7, as I have already intimated: granting the Secretary of State, and then by extension Scottish Ministers, the ability to direct GBR, which is meant to be operationally independent. That is the first confusion. I will not rehash the arguments, but hon. Members should take it as read that I repeat them here. As the Minister just mentioned, clause 8(7) will allow the Secretary of State to revoke a direction given by Scottish Ministers under that clause. That is confusion No. 2. We anticipate circumstances in which GBR has a direction of travel—that is not meant to be a rail pun—with which the Scottish Minister disagrees; the Scottish Minister issues a direction for GBR to go in a different direction, and then the Secretary of State disagrees with that direction and issues a revocation. What a recipe for confusion, delay and poor governance that creates! Who is really in charge of the railways in Britain? It is certainly does not sound as though it is GBR, which is being second-guessed on the one hand by the Scottish Ministers and on the other by the Secretary of State. It does not sound as though Scottish Ministers are in charge even in Scotland, because they can suffer a revocation from the Secretary of State. Yet the consultation document tells us, as the Government have told us time and again, that “GBR will be operationally independent, staffed by experts and professionals from the rail sector…who will be empowered to deliver for passengers and freight customers without government interference in day-to-day decision-making.” When did that change? Perhaps the Minister can let us in to the secret. Clause 8 not only prevents GBR from being independent—as clause 7 does—but prevents devolved Ministers from acting within their own devolved settlements without being second-guessed by the Secretary of State. I accept that the Scottish Cabinet Secretary for Transport, Fiona Hyslop MSP, when speaking about clause 8 during the Transport Committee evidence session, seemed not to oppose that oversight, as she recognised that certain aspects, such as access and freight, remain reserved. It seems that Scottish Ministers are content to accept the clause as drafted because a further memorandum of understanding will create firebreaks between non-devolved powers, in which the Secretary of State may intervene, and devolved powers. That could be okay, but we as a Committee do not know, because we have not seen the memorandum of understanding, even in draft. We are going to come back to this issue again and again. There are a plethora of documents designed to support the operation of GBR—to support this skeleton Bill—and yet we have not seen them. How can this Committee do our job of scrutinising this Bill line by line, seeking to improve it and to ensure that it achieves the objectives that the Government say it does, when 19 documents and counting—documents that are crucial to the actual running of the railway both in Scotland and in the United Kingdom as a whole—are absent, even in draft? Bill Reeve, the director of rail reform for Transport Scotland, when invited to add further to the remarks from the Cabinet Secretary, said: “An awful lot will rely on the memorandum of understanding to flesh that out and give examples.” There is a question for the Minister surrounding this memorandum of understanding for Scottish and Welsh Ministers. A lot of the powers in the Bill seemingly rely on a document that is not part of the Bill. Will the Minister provide details of the memorandum of understanding prior to the passage of this Bill? If not, why does he refuse to let us know what the memorandum of understanding is likely to stay? Why does he believe that Parliament should approve a working arrangement between the devolved Governments on which no consultation has been undertaken? I will speak further in detail on the memorandum of understanding when we reach clauses 23 and 24, but it is important that Ministers note that the current framework of the Bill relies on a document that has little oversight or clearly defined objectives, and which we have not seen.

  • 27 Jan 2026 · Railways Bill (Fifth sitting) · Hansard source
    More

    I will deal briefly with amendment 143 and develop some arguments on the other amendments. I congratulate the hon. Member for Didcot and Wantage on tabling amendment 143, which pushes in exactly the same direction that I have been pushing today, and also last Thursday, in developing the concern about increasing micromanagement by Department for Transport officials in the name of the Secretary of State, which will undermine the independence of GBR as a tactical organisation. The culture is already there: the Department has been micromanaging the railways to an increasing extent since 2012 at the latest. This Bill needs to change culture. It is not a steady-state Bill; it is a once in a generation opportunity to change the culture not just of GBR, moving it away from Network Rail, but of the Department for Transport, which is as necessary as the other cultural change. If this Bill is to achieve what it is meant to, the Department’s relationship with the railways should properly be changing. Amendment 143 is a modest but important proposal that would go some way to facilitating that. Dealing with the group as a whole, and continuing the theme of the exercise of functions and guidance by the Department, the Opposition once again note the contrast between the supposed independence of GBR and the various mechanisms that the Department and the Secretary of State have managed to wheedle into the Bill to grant themselves extra powers, whether as a last resort or, as I fear, to create a micromanaging charter, and where that last resort, as it has been described, has no qualifying criteria—although as we have heard from the Minister, that is seemingly of little consequence. The clause enables the Secretary of State to “issue and publish guidance”, with notable devolved exceptions, which will allow the Secretary of State to “clarify policy intentions to GBR.” The explanatory notes acknowledge that “in most cases requiring course correction, guidance would be used before directions,” although I note that it is not required. The Government anticipate that they could move straight to directions if they wish to. However, subsections (1) and (2) are very clear: “The Secretary of State may give guidance…or revoke guidance” without any qualifying criteria at all. What is guidance? It is a steer short of direction, and an application for an injunction against GBR—which we have just voted in favour of—destroys the myth of GBR operational independence. It will be taking orders from the Department for Transport, because that is the status quo ante. Without strengthening this clause and some others, we will confine the relationship between the Department for Transport and the newly created GBR to “more of the same”. That is the fear that we should collectively be fighting against. The guidance will be not just on the strategic direction or the business case, but on delivery decisions, at the whim of the Department. We can say, “Well, it’s the Secretary of State. This will be done under advisement,” but we all know that in practice it will mean officials micromanaging GBR in the name of the Secretary of State, who will provide the rubber stamp. I fully expect the Minister to reassure me that that would never happen, and that the provision is only for course corrections. Now, if I was in the passenger seat of a vehicle and kept telling someone how to drive, I suppose I would call that a course correction, but they might call it backseat driving. That is the problem: the Bill is designed for backseat driving by the Department for Transport. Will the Minister explain how the clause is nothing short of backseat driving? I obviously wish GBR the best of luck, and I hope the Minister’s enthusiasm and optimism is fully justified, but I fear that the disastrous consequence of forcing it to walk on eggshells will be constant second-guessing. I have been involved in an organisation in which there was second-guessing—no one was sure who had the decision-making power—and it was a disaster. If there is second-guessing, the organisation as a whole does not know when a decision has been taken. Does the power lie with the board? Does the board have to get clearance from a second board in a wholly different organisation, which might have a different view? Should people in GBR wait for the nod from the Department for Transport before taking action within the organisation, particularly if it is a decision with which its sub-department may not agree?

  • 27 Jan 2026 · Railways Bill (Fifth sitting) · Hansard source
    More

    It is certainly welcome, but we are still in the position in which an improvement to a line—something as small as the Haughley junction improvement, which costs roughly £15 million to £20 million—still needs ministerial sign-off from the Treasury before it can be authorised. The Government have some way to go to improve the situation. This will leave us with a stakeholder management culture. My hon. Friend the Member for South West Devon is entirely right that many organisations in the 60% of the railway that is not being nationalised as part of GBR will be intimately and hugely impacted by GBR’s decisions—or will they? Will they, too, have to wait for the all clear from the Department for Transport? If GBR gets on the wrong side of Ministers or the Department, its course is going to be corrected to all manner of different ports. The combination of clauses 7 and 9 removes almost any semblance of operational independence from GBR. Clause 9(5) states that GBR “must have regard to guidance given under this section.” That sounds soft, but in practice it creates a standing expectation of compliance and makes it impossible for GBR to make dynamic tactical decisions that are free from day-to-day second guessing by departmental and ministerial intervention. That brings me to amendments 19 and 21, which would help defend the operational independence of GBR. If the Secretary of State is concerned about an aspect of GBR’s performance, they may instead issue guidance to inform GBR of its failure to meet the key performance indicators. Additionally, under clause 10, the Secretary of State may give guidance only if “Scottish Ministers have drawn to Great British Railways’ attention that Great British Railways is not meeting a key performance indicator…and…Great British Railways has not taken action to remedy this failing within the period of two months.” As a result, the amendments would apply to GBR in both England and Scotland. Finally, amendment 20 repeats the argument made about directions or guidance given by the Secretary of State on the general level and structure of fares, and it would introduce new subsection (5A), which states: “If the Secretary of State uses the powers in this section to give guidance to Great British Railways about the general level and structure of fares for travel on railway passengers services designated under section 25 or 26, then the Secretary of State must publish the assumptions, criteria, and objectives underpinning any guidance.” That is self-evidently sensible, and I look forward to the Minister agreeing with me.

  • 27 Jan 2026 · Railways Bill (Fifth sitting) · Hansard source
    More

    My hon. Friend is absolutely right. We have made that point as forcefully as we can. I trust the Minister when he says that he will take it away and do his best with his ministerial and departmental colleagues, but it is not just a matter of saying, “We kind of understand that licences already exist. Licences have been issued by the Office of Rail and Road. It will not be some kind of copy and paste, but taken from what already exists and we are going to get something similar here.” As Ben Plowden said, there are various references in the documents that the Government have published to something very different: a streamlined licence. That begs all sorts of questions about what is anticipated to be removed from the licence. The Department for Transport has got as far as saying it is going to be smaller, perhaps significantly smaller because it is streamlined, but this is critical. The licence of ORR is a mission-critical document that anyone who works in the industry would acknowledge, yet we are told it is streamlined, and therefore elements of what is traditionally considered to be a licence under the current system are anticipated to be removed. Is the Minister able to tell us what parts are likely to be removed? What is it? Because the Government documents refer to a streamlined licence, he can tell the Committee what that means. The Department says it is going to be streamlined, but what does it intend to remove to justify that description? It must be somewhere within the Department; otherwise those words would not have been used in the supporting documentation. There is no excuse for the Minister not to describe the definition of a streamlined licence and what is anticipated. My hon. Friend the Member for South West Devon made the point that the Minister has corrected the record on when the draft licence will be provided during the passage of the Bill through both Houses, but in the next breath he said there will be consultation on that document, which has not yet started. How can that consultation be anything other than a paper exercise? The Minister seems confident that he can go through a consultation process that has not yet started, that the Department can then properly consider the contributions and come to a considered view and redraft the licence, taking into account all the comments, good, bad and ugly, that the consultation came up with, and then produce the draft licence in the two or three months that the Bill has to run through both Houses. That is an extraordinary position. It suggests either that the Minister will have to come and make a second point of order in a couple of months’ time, or that the consultation to which he refers is an absolute farce, because the Government have already decided what they want to do. They are going through the performance of a consultation, but they have already made up their mind. Perhaps the Minister will tell us which one it is. Amendment 109 would constrain the Secretary of State’s ability to modify GBR’s licence without first seeking consent from the ORR and the passengers’ council. It is part of a series of amendments including amendments 110, 112 to 116 and 233, to which I will speak later. The Government strategy is that the Bill will be the legislative shell for the creation of GBR. Crucial matters of detail, such as the licence under which GBR will operate and important long-term strategies, business plans, targets and so on are separate and, at this stage, missing. Such details matter and deserve proper scrutiny. We know that other plans and targets are unlikely to be set until after the Bill is enacted, so it is important to include strong checks and balances. That is the purpose of amendment 109. At present, the Bill merely requires the Secretary of State to consult the Office of Rail and Road. Legally, that is weak; after consultation, the Secretary of State may simply ignore whatever the ORR comes up with. The amendment and those linked to it would require the Secretary of State to obtain the Office of Rail and Road’s agreement for the licence to be issued. Subsequent amendments would require the Office of Rail and Road’s agreement for the licence to be modified. Modification of the licence requires consent from the new passenger watchdog. If the passenger watchdog is to be as powerful in championing the interests of passengers as the Government claim they want it to be, it requires proper powers that go beyond an invitation to be consulted. For that reason, I propose that we put amendment 109 to the vote.

  • 27 Jan 2026 · Railways Bill (Fifth sitting) · Hansard source
    More

    My hon. Friend is entirely right. That will be a theme of our comments on and challenges to the Bill throughout the progress of our scrutiny: accountability without responsibility is no accountability at all. Time and again, we see an unwillingness from those who drafted the Bill to trust the role of parliamentarians as scrutineers. As a former businessman, I know—I have not made this one up; it is not unique thinking—that, in any organisation, you get what you measure. That will have been the case in any organisation that hon. and right hon. Members may have worked in in the private or public sector: the NHS has targets because it gets what it measures. At the moment, the Bill measures very little on GBR’s performance, and where it does, that disappears off to the Department for Transport and is reported to other civil servants. As parliamentarians, we know our value in holding not only GBR to account but the Government of the day, which will not always be a Labour one. That is our important role, which is done through the Select Committee process and more widely. As parliamentarians, we should seek to improve the Bill. I recognise that we will have a number of Divisions during this process and I am unlikely to win a single one, but I urge the Government to listen—perhaps to the private comments of its own Committee members; they do not have to tell me about it—because these are genuine areas of improvement that we as parliamentarians should be encouraging the Government to add to the Bill. On that note, I will stop.

Published records only — not a full account of an MP’s work. How we work →