Question follow-through · 11987
Solar Power: Planning Permission
To ask the Secretary of State for Energy Security and Net Zero, whether independent Agricultural Land Classification surveys conducted by a qualified soil scientist are a mandatory requirement before solar farm applications on potential BMV land are deter
About this written question
A written question asks a government minister for information in writing. Parliament publishes the question and any answer.
- Answering body
- Department for Energy Security and Net Zero
- Tabled
- 22 Jun 2026
- Target answer date
- 24 Jun 2026
- Answer
- 30 Jun 2026 · 8 calendar days after tabling
Elapsed calendar days describe the record timeline, not whether Parliament considers an answer on time.
More questions by this MP on Environment and energy
- Solar Power · 25 Jun 2026
- National Grid: East of England · 9 Sept 2026
Shared topic keywords suggest a connection; they do not establish a follow-up.
Votes on this topic
- Taxation (Energy and Vehicles) Bill Committee: New Clause 5 · 1 Jul 2026
- Taxation (Energy and Vehicles) Bill Committee: New Clause 4 · 1 Jul 2026
- Taxation (Energy and Vehicles) Bill Committee: New Clause 2 · 1 Jul 2026
These Commons divisions share a topic label. The question did not necessarily lead to a vote.
Recorded timeline
22 Jun 2026
Question tabled
To ask the Secretary of State for Energy Security and Net Zero, whether independent Agricultural Land Classification surveys conducted by a qualified soil scientist are a mandatory requirement before solar farm applications on potential BMV land are deter
24 Jun 2026
Target answer date
Date supplied by the official written-questions record.
30 Jun 2026
Answer published
Agricultural Land Classification surveys are typically conducted using existing site survey reports, where available. Where this isn’t the case, the developer commissions a new survey, which should be conducted by soil scientists, or experienced soil spec...
Official data retrieved 28 Sept 2026.
Later records
Possible follow-up questions
Strong links require the same MP, department and exact heading. Other same-department questions are shown as unreviewed candidates, not as confirmed follow-ups. No debate link is asserted unless a stable source relationship exists.
Solar Power
25 Jun 2026 · To ask the Secretary of State for Energy Security and Net Zero, what proportion of the capacity required to meet the 47GW solar target by 2030 will come from (a) rooftop installations, (b) brownfield and previously developed land and (c) greenfield develo
National Grid: East of England
9 Sept 2026 · To ask the Secretary of State for Energy Security and Net Zero, what assessment his Department has made of whether existing compensation arrangements adequately reflect the impact of the proposed Norwich to Tilbury electricity transmission project on the