To ask the Secretary of State for Energy Security and Net Zero, whether independent Agricultural Land Classification surveys conducted by a qualified soil scientist are a mandatory requirement before solar farm applications on potential BMV land are deter

answeredDepartment for Energy Security and Net Zero

About this written question

A written question asks a government minister for information in writing. Parliament publishes the question and any answer.

Answering body
Department for Energy Security and Net Zero
Tabled
22 Jun 2026
Target answer date
24 Jun 2026
Answer
30 Jun 2026 · 8 calendar days after tabling

Elapsed calendar days describe the record timeline, not whether Parliament considers an answer on time.

More questions by this MP on Environment and energy

Shared topic keywords suggest a connection; they do not establish a follow-up.

Votes on this topic

These Commons divisions share a topic label. The question did not necessarily lead to a vote.

Recorded timeline

  1. 22 Jun 2026

    Question tabled

    To ask the Secretary of State for Energy Security and Net Zero, whether independent Agricultural Land Classification surveys conducted by a qualified soil scientist are a mandatory requirement before solar farm applications on potential BMV land are deter

  2. 24 Jun 2026

    Target answer date

    Date supplied by the official written-questions record.

  3. 30 Jun 2026

    Answer published

    Agricultural Land Classification surveys are typically conducted using existing site survey reports, where available. Where this isn’t the case, the developer commissions a new survey, which should be conducted by soil scientists, or experienced soil spec...

Open official record

Official data retrieved 28 Sept 2026.

Later records

Possible follow-up questions

Strong links require the same MP, department and exact heading. Other same-department questions are shown as unreviewed candidates, not as confirmed follow-ups. No debate link is asserted unless a stable source relationship exists.

Unreviewed candidateSame MP and department; topic relationship is unreviewed

Solar Power

25 Jun 2026 · To ask the Secretary of State for Energy Security and Net Zero, what proportion of the capacity required to meet the 47GW solar target by 2030 will come from (a) rooftop installations, (b) brownfield and previously developed land and (c) greenfield develo

Unreviewed candidateSame MP and department; topic relationship is unreviewed

National Grid: East of England

9 Sept 2026 · To ask the Secretary of State for Energy Security and Net Zero, what assessment his Department has made of whether existing compensation arrangements adequately reflect the impact of the proposed Norwich to Tilbury electricity transmission project on the