  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Normally, the hon. Member for West Aberdeenshire and Kincardine is my sparring partner in both the Scotland and energy spaces, so it is nice that he has made an appearance in this debate, but I disagree with his amendment. The main reason is that it concerns a devolved competence. This is a UK Government Bill and it is right, given that the resource of local planning decisions and planning authorities is devolved to Scottish Ministers, that they make the decision on how they resource statutory consultees and local planning authorities. On the point about community benefits, the Scottish Government already have an established process. The 10-year onshore wind ban in England was not in place in Scotland, and the process of good practice for community benefits for onshore wind, for example, is already quite well developed. Processes are in place. Over the past 12 months, developers have offered more than £30 million in community benefits. We are, of course, exploring all options and the Bill includes bill discounts for network infrastructure—we will come to that shortly—but we are open to much more on community benefits generally, because we agree that if communities are hosting nationally important infrastructure, they should benefit, as the hon. Member for Hamble Valley rightly said. However, for the reasons I have outlined—this is a devolved competence and not a matter for me as a UK Government Minister—we hope the hon. Gentleman will withdraw the amendment.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    It is a pleasure to serve under you, Mr Twigg. We thought a change in the tone of the Committee for a few clauses would be helpful, before we return to the other Minister. Amendment 36 clarifies that a modification made under clause 9 may include changes to the order of the queue for connections, which works towards the broader aim of improving the management of connections to the transmission and distribution systems. The purpose of all this work is to reorder the connections queue. That is essential to deal with the extreme level of oversubscription in the queue, and enable a move from the “first come, first served” proposition that we have at the moment to a “first ready and needed, first connected” approach. The amendment is essential to fulfil the intent of the clauses, which is to provide the means to implement connections reform should the current Ofgem and industry-led process face delays or be unable to realise its benefits in full. Amendment 37 clarifies that the power of the Secretary of State to direct Ofgem to modify a licence or agreement may be exercised only for the purpose of improving the management of connections to the transmission or distribution system, which places an additional safeguard on the use of that power. Amendment 38 clarifies that the Secretary of State or Ofgem may modify an agreement under the powers in clause 9 even where the effect of the modification might amount to a repudiation of the agreement, which provides consistency with the existing wording in clause 12. It is also essential to fulfil the intent of the clauses. Finally, amendments 39 and 40, which are purely consequential on amendment 38, move the definition of “qualifying distribution agreement” within clause 9. I turn to clause 9 more broadly. As many Members will know, the current first come, first served electricity grid connections regime is causing considerable and unacceptable delays. It is blocking clean power projects from connecting to the grid, and blocking demand projects that are critical to our economic growth as a country. The National Energy System Operator—NESO—and Ofgem are reforming the electricity grid connections process to a strategically aligned first ready, first connected system. The reformed process will require projects to meet readiness, technological and locational criteria to progress. The reform requires complex amendments to codes and licences. Clause 9 therefore enables the Secretary of State or Ofgem to support the existing connections reforms by directly amending electricity licences, and associated documents or agreements, should that prove necessary. It is intended to be used should the existing processes enacting connections reforms face significant delays, including alignment with strategic energy plans. The Government or Ofgem will then be able to expedite a set of changes outside the standard process to ensure that our clean power mission is delivered at pace. The clause is focused on improving the management of connections to the transmission or distribution system, and follows precedent in being time-limited to three years after commencement of the power on Royal Assent. Similar powers have been taken in the past, including in section 84 of the Energy Act 2008, but they were also time-limited and are therefore no longer in force. Clause 10 details the scope of the power in clause 9, which enables the Secretary of State or Ofgem to make amendments to electricity licences and associated documents or agreements. The clause first defines the power to modify in clause 9, which includes the ability to amend, add to or remove provisions, and to add or release parties from agreements. It will enable the Secretary of State or Ofgem to support Ofgem and NESO’s existing connections reforms by directly amending electricity licences, and associated documents or agreements, should that prove necessary. The clause further details how the Secretary of State or Ofgem can exercise the power, which includes allowing for general or specific modifications, incidental changes and provisions that do not necessarily relate to the activities authorised by the licence. It ensures that modifications to standard licence conditions are reflected in future licences, and specifies the conditions under which licences can be revoked. Finally, it allows agreements to include conditions that must be met before the taking of specific steps, or provision about the procedure for varying the agreement. Similar scope and procedure have been outlined previously in legislation, including in the Nuclear Energy (Financing) Act 2022. Clause 11 details the procedure around the provision in clause 9 to enable the Secretary of State or Ofgem to make amendments to electricity licences and associated documents. It aligns with the precedent established in section 8 of the 2022 Act, which detailed the procedure to modify a generation licence of a relevant licensee nuclear company. The clause obligates the Secretary of State or Ofgem—I am not sure how many more times I will say that in this speech—to consult a list of specified persons, such as the holder of any relevant licences, NESO and any other appropriate individuals, before making modifications. Details of those modifications must be made public as soon as reasonably practicable to ensure transparency with wider stakeholders. However, the Secretary of State or Ofgem can exclude from the publication any information that could harm commercial interests. I will respond on new clause 19 after it has been spoken to.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    There is no contradiction here at all. We are confusing two different things. My ability to say that the Scottish Government could raise x amount of money and must spend it on y is different from what we have clearly outlined—the hon. Gentleman has just repeated it—which is that at the moment Scottish Government Ministers do not have the power to raise fees for wayleaves, as is the case in England and Wales. Those are two very different things. I have said clearly, I think six or seven times now, that at the moment Scottish Government Ministers have no power to charge for the processing of wayleave applications. The clause will give them the power to do so. Of course, I would hope that those funds will be spent on the planning system, or whatever it might be, but I am not going to bind their hands and evaluate the success or otherwise of that in this Committee. The two issues are quite separate.

  • 29 Apr 2025 · National Grid Resilience · Hansard source
    More

    I will not comment on individual investment cases, but in every single case the Government make an assessment and we look at the national security implications seriously, just as the Conservatives did when they were in government. I would just gently say that the reason the supply chains in this country are as weak as they are is that they were underfunded and under-invested for years by the Conservatives. There could have been a decision, at the point when they took ambitious steps to move towards clean power, to build the supply chains here, but they chose not to do so; they chose to tow things into our waters instead. We are reversing that, but it cannot happen overnight.

  • 29 Apr 2025 · National Grid Resilience · Hansard source
    More

    Before I answer the hon. Lady’s substantive question, I want to offer her my huge congratulations on smashing to smithereens on Sunday the previous record held by a female MP in the London marathon. Great Britain has a highly resilient energy network with diverse sources of supply. The national energy system operator can balance the system in a wide range of scenarios, including potential disruptions to offshore infrastructure.

  • 29 Apr 2025 · Nuclear Power Sector · Hansard source
    More

    Nuclear power is a critical part of our clean power ambitions. We are making strong progress on Sizewell C and Great British Nuclear is driving forward its small modular reactor competition. We have also seen the nuclear regulatory taskforce set up by the Prime Minister, and we are ending the legacy of no new nuclear being completed in the 14 long years when the Conservatives were in power.

  • 29 Apr 2025 · Nuclear Power Sector · Hansard source
    More

    The hon. Lady has raised with me that point and the wider question of energy jobs in her constituency a number of times, and I thank her for that and for the way she has done so. Wylfa is an important site and continues to be one that the Government are considering. We will take forward those decisions in due course. As I have said to her on a number of previous occasions, we are committed to delivering the jobs that go with that and Wylfa remains an important site.

  • 29 Apr 2025 · Nuclear Power Sector · Hansard source
    More

    Planning matters, including the siting of new nuclear, are devolved to the Scottish Parliament, so it is rightly for it to decide. However, I agree that Scotland is missing out on the huge potential of new nuclear. If the ideological block introduced by the SNP were lifted, billions of pounds could be invested in Scotland, with the countless skilled jobs that go with that. That could well be delivered next year if a Scottish Government are elected that take the industry and opportunity of Scotland seriously and deliver those well-paid skilled jobs—that would come by electing a Scottish Labour Government.

  • 29 Apr 2025 · Topical Questions · Hansard source
    More

    The hon. Gentleman makes a very important point about the role that local community energy can play; I think that is what he is alluding to. We are committed to ensuring that. Great British Energy local has already made some announcements in this space, including on local energy funding in England. We will have much more to say in due course, but we want to ensure a partnership, so if the hon. Gentleman writes to me, I will make sure that what he says gets to GB Energy.

  • 29 Apr 2025 · Topical Questions · Hansard source
    More

    I have had a number of meetings on this issue since coming into post. Clearly, tidal could play an important part in an energy mix. We have been clear that we are supportive of it in principle, but questions about its cost benefit and value for money must be answered. We are happy to continue looking at it in future, as projects develop and more detail comes forward.

  • 29 Apr 2025 · Topical Questions · Hansard source
    More

    We were delighted to switch on the wind farm; the Secretary of State for Scotland was there to push the button last week. It is a fantastic example of the potential of offshore wind. Of course, I am happy to meet the hon. Gentleman. I have already met him, and had a very enjoyable conversation, and I am very happy to talk about the issue. The review of the electricity market arrangements that we are going through will look at the issue of transmission charges. It is an important conversation to have, and I am happy to speak to him on the subject.

  • 29 Apr 2025 · Topical Questions · Hansard source
    More

    A consultation has just closed on the future of North sea energy. We have been very clear that our manifesto commitment was to not issue new licences for exploring new fields, but we will manage existing fields for the entirety of their lifespan.

  • 29 Apr 2025 · Topical Questions · Hansard source
    More

    My hon. Friend is right to make the point about Longannet. We have conversations with Scottish Power on a number of issues, including this. He again emphasises the important role that nuclear could play in Scotland in the future. It could obviously be an important site for a range of uses, but if the ideological ban on nuclear by the SNP were lifted, we could look at other opportunities for such sites.

  • 29 Apr 2025 · Topical Questions · Hansard source
    More

    My hon. Friend is right to point out that public charging points are critical. That is why the regulator, Ofgem, allocated £22 billion over the next five years to maintain and upgrade the infrastructure. I have had a number of meetings with network operators about this question, and I work closely with my colleagues in the Department for Transport to ensure we are rolling out more points.

  • 29 Apr 2025 · Great British Energy · Hansard source
    More

    I think the right hon. Gentleman gives the game away there. Although the Conservative party did not particularly care where the supply chains were, we in the Labour party are committed to delivering good, well-paid jobs in this country. If he was so concerned about investing in British supply chains, he might have bothered to vote for Great British Energy in the first place.

  • 29 Apr 2025 · Great British Energy · Hansard source
    More

    Great British Energy will support the creation of thousands of high-quality, well-paid jobs right across the country and help rebuild the UK’s industrial heartlands. Just last week, the Prime Minister announced £300 million for Great British Energy to kick-start supply chains here in the UK. Once the Great British Energy Bill finishes its final stages in Parliament, we will come forward with more exciting plans for our domestic clean energy champion.

  • 29 Apr 2025 · Great British Energy · Hansard source
    More

    My hon. Friend is absolutely right to point out that, with Great British Energy and our clean power mission, we are trying to create the jobs that will deliver that transition here in the UK, which is something that the Conservatives failed on for many years. We expect that funding, and much more that will come from Great British Energy, to mobilise more than £1 billion in private investment in domestic supply chains, driving forward manufacturing and industry here in the UK and the good jobs that go with it.

  • 29 Apr 2025 · Great British Energy · Hansard source
    More

    I am not quite sure which one of the variety of parts in that speech the hon. Gentleman would like me to respond to. As usual, he steamrolls through his question faster than he ran the marathon— I congratulate him on that. He happens to be the only person in Aberdeenshire who is against investment in his community. When Labour Members voted to deliver investment through Great British Energy—not through jobs in the headquarters but through the investment it makes in supply chains and innovation in his city—he voted against it, and he will have to answer to his constituents for that.

  • 24 Apr 2025 · Planning and Infrastructure Bill (First sitting) · Hansard source
    More

    Q Christianna, this Bill has a significant amount of planning reform in England and Wales, but the key element in the energy space in chapter 2 is around the reforms to Scottish consenting. We have worked very closely with the Scottish Government to update the Electricity Act 1989. Can you give any sort of sense, from your extensive experience in this in Scotland, of how much those changes are necessary, or perhaps how much of the development is being held back by that planning reform not being updated at the moment? Christianna Logan: We really welcome the powers in the Bill that create that framework to increase the timeliness and effectiveness of consenting in Scotland, particularly around introducing timescales for determinations and replacing automatic trigger of public local inquiries with a reporter-led process. Public inquiries are one of the main causes of delay to consent decisions in Scotland, with the impact and cost of that borne ultimately by bill payers and local communities through local authority investment. We believe that to make the powers in this Bill effective in practice, the secondary legislation will be critical. We ask that the secondary legislation providing the details of implementation is delivered in parallel with the Bill, so that it can be laid as soon as decisions are made, and that within determination, timelines are set at 12 months to make sure that we can get timely delivery. We welcome all the joint working between this Government and the Scottish Government, and we would like to see that continue for that secondary legislation. We welcome the Scottish Government's commitment to a 12-month determination for projects, but we are not yet seeing that in practice. For example, our Sky project, which is both an energy security and decarbonisation project, is still awaiting determination more than two and a half years on. That is why the ask is so important.

  • 24 Apr 2025 · Planning and Infrastructure Bill (First sitting) · Hansard source
    More

    Finally, Dhara, picking up on the questions on connections reform and the wider push in the Bill on how we build network infrastructure more quickly and the ambition of that, how critical is it to the broader energy space—particularly on the questions of energy security, bringing down bills and the wider space on our energy mix going forward—that we build more network infrastructure and get the grid working? How critical is that aspect to delivering in the 2020s, and in the 2030s in particular, to meet the demand that we are going to see, and the Government’s other objective of bringing down bills? Dhara Vyas: That is absolutely the right question to be asking, because we will not achieve any of it unless we unblock the issues we are seeing within the infrastructure space. The reality is that with these so-called zombie projects, at least half of them are ready to move on to the next stage. In large part, that is down to the work that has been happening as part of the connections reform project. It is really important that we keep on moving with the momentum we have right now, because gaining planning permission and making progress through the new milestones that the National Energy System Operator has set out is the next big challenge for us. We are in a really difficult position right now. Bills and debt owed by customers to energy suppliers are at a record high. We are still really feeling and living in the long shadow of the cost of living crisis, which was partly down to the energy security crisis following the illegal invasion of Ukraine. Investing in an abundance of clean power will be completely pointless unless we have the infrastructure to move it around the country, and unless we invest in clean power, we will not ultimately bring down bills to the extent that we need to. The other part of that is demand. We will see demand increase by at least sixfold. We are going to have electrification of our homes and our transport, which brings us back full circle to the need to be able to move the electricity around.

  • 24 Apr 2025 · Planning and Infrastructure Bill (First sitting) · Hansard source
    More

    Q Good afternoon. Thank you for joining us. As a Government we have set out the ambitious clean power by 2030 plan, which involves significant roll-out of renewables. Key to that will be storage and our ambition to build the first long-duration storage in 40 years in this country. I would like to ask Beatrice and Ofgem, what is your sense of the importance of the mechanisms for doing that, particularly the cap and floor financing scheme; and how important is long-duration storage to the energy mix we are trying to build? Beatrice Filkin: As you said yourself, Minister, we have not seen any large scale, long-duration energy storage built in this country for decades now. We know that the market is not willing to take on those risks at the moment and it is absolutely right that the Government are instructing us through this Bill to expand the regimes and protections. We support the proposed introduction of a cap and floor regime for long-duration storage. We have seen NESO’s advice to you as part of the development of the Clean Power 2030 Action Plan—that increasing the amount of flexible storage on the system is critical to getting through your clean power targets. We are very keen to be part of supporting that. We think the cap and floor regime has proved its worth over the last decade or so through interconnectors, and obviously, we are adjusting it now with input from a wide range of stakeholders to make it appropriate for the long-duration storage schemes.

  • 23 Apr 2025 · North Sea Oil and Gas Workers: Transitional Support · Hansard source
    More

    It is a pleasure to serve under your chairship, Sir Desmond. I join others in congratulating the hon. Member for Aberdeen North (Kirsty Blackman), not just for securing this important debate but for the tone with which she introduced it. Her seriousness and passion came through in her contribution. I genuinely thank her for that, as well as for all the conversations we have had on this important topic. It has been a wide-ranging debate, but at the heart of all the contributions have been three key things, which I will try to sum up. First, we may all disagree on the timing, pace and detail of the transition, but there is an acknowledgment and understanding that a transition in the North sea is under way. It is important to recognise that. Secondly, if we accept that, as it seems we all do, then we need a credible and detailed plan for how to manage the transition. The hon. Member for Aberdeen North put it well by saying that the transition needs to be managed properly, and I will come back to that point. Thirdly, the workforce must be at the heart of any plan and transition. The shadow Minister made the point well: this is deeply personal for anyone with a job in the oil and gas sector, but particularly in north-east Scotland, where there is a significant concentration of workers in the industry. Many Members have spoken about the importance of oil and gas in our energy story. A few months ago, I was pleased to be at BP’s headquarters to celebrate the 60th anniversary of the first licence being issued in the North sea, and there was a powerful video of the history of some of BP’s offshore infrastructure. The engineering skill that it has taken to extract oil and gas from extremely difficult North sea waters over the past 60 years is extraordinary and, as I have said on a number of occasions, we should be very proud of that workforce and everything it has achieved. Oil and gas will continue to play a critical role in our energy mix and economy for decades to come. However, as we and the world embrace the clean energy transition, I want us not just to be proud of the history of the North sea but to be hugely ambitious and excited about the opportunities in the next chapter of our energy story. Our clean power mission is about not just driving forward clean power in this country but creating the jobs in manufacturing and industry that go along with it, and it is critical that those jobs materialise in the communities that have been mentioned. It is right that we recognise that tens of thousands of jobs have been lost in the sector over the past 10 years. The truth is that we should have been planning for this transition a long time ago. My hon. Friend the Member for Alloa and Grangemouth (Brian Leishman) talked about Grangemouth. There is no greater example of the failure to plan for the transition than Grangemouth: we knew years ago that it was in a precarious position and should have been planning for the workforce at that point. My driving purpose in my role is ensure that we do not make the same mistake again in the wider North sea sector. The hon. Member for Aberdeen North asked whether the Government are listening, so I want to say how much we have engaged with the sector and how much time I have spent in Aberdeen listening to the industry—not just the oil and gas companies themselves, but the companies involved right through the supply chains, in decommissioning and in training. I had an interesting visit to a training provider and met apprentices who are working in oil and gas in the immediate term but will transition into renewables. They are being trained both on oil and gas platforms and on the renewables jobs that come next. Exciting work is going on, and we need to capitalise on it and speed up such projects across the city and the north-east. We have a fantastic opportunity to utilise the skills that are already in Aberdeen, which many Members have mentioned. Given the global race for skilled workers and for much of the equipment and the supply chains for the clean power missions around much of the world, we have a real opportunity to capitalise on that in Aberdeen. I suspect that the ears of Robert Gordon University will be burning after this debate, given the number of times it has been mentioned. I had a fantastic visit there a few months back to go through some of the data in great detail, and it was fascinating. Members made the point about the number of jobs that are transferable from oil and gas into renewables. That presents us with an enormous opportunity to provide long-term, sustainable jobs for people. The pace at which we do that, and the methods we use to support the workforce to transition, are key, which is why, when we came into government, we were determined to work with the Scottish Government and with industry to move forward on skills passporting, and we have launched the first phase of that. There is clearly more work to do on expanding the passporting process, but that is a sign that we are taking practical action to support the workforce to transition. The hon. Member for Aberdeen North asked about a plan for the transition, which was a good point to make. We have launched our consultation on the future of energy in the North sea. We were keen for that to be a genuinely open conversation with industry, communities and trade unions about what the future of energy in the North sea should look like—not a conversation focused narrowly on a series of specific questions. The consultation is still open: there is a week left for those who have not had a chance to submit their responses—I am sure that many thousands are watching this debate online—so please do submit them. It is a key opportunity. We have deliberately asked open, broad questions so that we can have a genuine conversation about the future of energy in the North sea. The first section of the consultation deals partly with the data and the science about the decline of the North sea basin. The shadow Minister rightly made the point about language. I have always been careful about the language that I use, but it is important to recognise that the declining nature of the basin means that we have to start planning now for what comes next. As part of my engagement on the issue I have had a number of roundtables, including with trade unions a few weeks ago, to look at the specific support that is necessary for the workforce now.

  • 23 Apr 2025 · North Sea Oil and Gas Workers: Transitional Support · Hansard source
    More

    I was going to come to that point, which has been well made. In both consultations, we are looking internally at how quickly we can turn around the responses. Clearly, there is a balance to be struck, particularly in respect of the consultation on the future of the North sea. It is a hefty document and we expect a significant number of responses, which is a good thing. There is also a balance to be struck between turning around a response quickly and having a credible, detailed look at all the evidence that has been submitted, but we are trying to move as quickly as possible with both consultations. I want to turn briefly to the point about the future, and the points that a number of Members made about investment in clean energy. It is right to say that the future of the North sea has enormous potential for offshore and floating offshore wind, and for a number of other industries, such as hydrogen and carbon capture. Since coming into government we have moved as fast as possible to drive that forward, including establishing, as the hon. Member for Aberdeenshire North and Moray East (Seamus Logan) mentioned, Great British Energy in Aberdeen—although I cannot help but notice that the SNP did not support that. It is all about driving investment, not just by creating jobs in Great British Energy’s headquarters but through the investments it makes in supply chains and developments throughout the country, particularly in the north-east of Scotland. We oversaw a record-breaking renewables auction and, as many Members mentioned, we are currently working through the process of the clean industry bonus, which is designed to reward investment in good manufacturing jobs and clean supply chains. This gets to the heart of the point made by many Members about how we bring the benefits of the clean power mission to the UK, delivering the industrial jobs that too often have been missing in our transition. Of course, the clean power action plan will drive £40 billion a year of private investment towards our goal of clean power by 2030. I am conscious of the time, but I want to reflect on two brief points that the hon. Member for Aberdeen North made in her closing remarks. The first is about listening to communities, which is important, and I will continue to do that, as will my colleagues. The second is about the oversight and management of the plan, which is a question we are looking at. I am always slightly resistant to simply saying that setting up a taskforce or a commission is the answer, but the point that the Just Transition Commission made, and that the hon. Lady also made, is right: we need to grasp it at the heart of Government, and we are actively looking at that. I again thank the hon. Member for Aberdeen North for her important contribution. The future of the North sea is incredibly important for all our communities, particularly in the north-east, but also for our energy and our economy in a wider sense. We are determined to deliver a credible, just and prosperous plan for the future, for the workforce now and in generations to come.

  • 23 Apr 2025 · North Sea Oil and Gas Workers: Transitional Support · Hansard source
    More

    I thank the shadow Minister for making that point. We deliberately launched the consultation on the future of energy and the Treasury consultation on the future of the EPL at the same time, because we want to bring them together to give certainty about the future of industry. My hon. Friend the Exchequer Secretary has been in Aberdeen a number of times and, indeed, we have we have had many of the same engagements, dealing with the fiscal forum and others and having the conversations. I engage with Treasury colleagues regularly on this question. The EPL, which has changed many times under both Governments, has not given industry the confidence it is calling for. We have been clear that it will end post 2030, and we want to put in place a regime that gives confidence about what the landscape looks like but still has the recognition of excess profits built into it. The consultation is open for, I think, another two or three weeks.

  • 23 Apr 2025 · North Sea Oil and Gas Workers: Transitional Support · Hansard source
    More

    I thank my hon. Friend for his contribution, but he tempts me into both concluding a consultation and speaking on behalf of the Treasury—two things that I absolutely will not do. But he made an important point. The purpose of the consultation—again, it is an open consultation with all those in the sector—is to get to the heart of some of these questions.