  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    The hon. Gentleman makes a reasonable point but, if I have understood him, it is a slightly different issue from the one we are considering. I will give him some extra clarity about the land use framework and any other material consideration that would need to be assessed. When looking at a national policy statement, the Secretary of State will have to have regard to such material considerations, be they the land use framework or any others, for the decision to be legally sound. The reason we cannot accept the amendment in the name of the hon. Member for Taunton and Wellington is that it is not necessary to specifically require that, as it would effectively repeat public law decision-making principles on the face of the Bill that would have to be taken into account anyway. For that reason, we cannot accept the hon. Gentleman’s amendment, so I hope he will withdraw it. I commend the clause to the Committee.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    It will be for the Secretary of State to consider applicants’ requests when they are made. They will issue their policy on redirection decisions, and issue guidance for clarity about precisely how the process will operate in certain circumstances. The access road example that I gave the hon. Gentleman is a good one. In that type of scenario, there is a very strong case for an access road application not to go through the full NSIP regime, particularly if the applicant in question is dealing with a local authority that is well skilled and well resourced, and that they feel is able to better deal with the application in a more timely fashion. They can apply to the Secretary of State to make such a redirection, but we will issue guidance on specifically how the power could be used.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    May I correct the hon. Gentleman? Local people in any part of the country affected by a development consent order will still be able to have their say on it. Nothing in the clause affects that arrangement.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    I think the thrust of the hon. Member’s question was about a numerical analysis. No, we cannot account for the behavioural change that would come if this clause is enacted. What we do know, from significant engagement with stakeholders in the infrastructure sector, is that lots of applicants would make use of the redirection route and are eager to do so. The examples I have heard from particular major economic infrastructure providers are where, as I say, they have a constructive and healthy working relationship with a local authority that they are confident is resourced and able to take the decision to approve or reject an application in a timely manner and they do not want to have to take it through the NSIP regime, which is currently their only route. As I said, section 35 already allows the Secretary of State to pull applications from other regimes into the NSIP regime. This will work the other way, and just provides a necessary flexibility. The point of clause 3, though, is to ensure that any given applicant can make a case to the Secretary of State to go into the regime that they feel is the most appropriate and proportionate for the application in question.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    I am struggling to follow what the hon. Gentleman’s specific concern is. He keeps throwing out the after-dinner speech example; that would not meet the threshold for a reflective amendment through this route. If the Government have made a policy change that has been subject to consultation and scrutiny in this House—

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    The hon. Gentleman has already made it clear that he will press the amendment, but let me take one last opportunity to reassure Members on this point. We have to be clear what the current requirements entail: they do not require the Government to agree with a Select Committee report, if it is issued in a timely manner; they just require the Secretary of State to respond to resolutions made by Parliament or its Committees. Those resolutions can ultimately be set aside if the Government disagree. As I said, we are not trying to remove wholesale parliamentary scrutiny or the ability of the public to engage and consult. All the changes that will come down this route, when it is appropriate and necessary to use, will have been scrutinised by Parliament and, in many cases, by public consultation on their own terms. However, we think that the removal of an aspect of parliamentary scrutiny is justified by the nature of changes that can be better reflected in policy within a national policy statement. We have had extensive engagement with the Chair of the Treasury Committee, my hon. Friend the Member for Hackney South and Shoreditch (Dame Meg Hillier), and the relevant Select Committee Clerks on what guarantees we can provide, while removing this requirement, to ensure that there is still adequate parliamentary scrutiny when the procedure is used. Finally, I want to bring home to Members what we think the change will allow. We estimate that, in many cases, the requirement to respond to resolutions, particularly in cases where a Select Committee’s response is not timely, adds at least three to six months to the process of updating a national policy statement. Given that we are talking about minor changes that are already policy and court decisions, we think that this is a necessary and proportionate means of ensuring that policy statements are up to date and that investors have confidence in the policy framework being applied. We therefore think that we can streamline the process, and will resist the amendment. Question put, That the amendment be made.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    In the interest of focusing the debate on the actual changes that we are making in the clause, when a national policy statement has been reviewed and is to be updated, and involves material changes, all the assessments and consultation that need to take place, including laying the NPS before the House of Commons, will remain in place. We are talking about a specific set of categories of reflective, small changes that, as I will make clear in my remarks later, have already been debated by Parliament in their own terms.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    I will give way in one second, if the hon. Member will allow me, because I think this is some useful context for some of the discussions that have taken place over recent months. The Government are grateful to my hon. Friend the Member for Hackney South and Shoreditch (Dame Meg Hillier) and the relevant Select Committee Clerks for engaging with me and my officials on the implications of the new procedure. We have agreed on certain guarantees to ensure that there will still be adequate parliamentary scrutiny when the procedure is used. As such, I am happy to restate today that, when the Government intend to use the reflective amendment route to update a national policy statement, we will write to the relevant Select Committee at the start of the consultation period. We would hope in all instances that the Select Committee responds in a prompt and timely manner, allowing us to take on board its comments. Ministers will make themselves available to speak at the Committee during that period, in so far as that is practical. The process retains scope for Parliament to raise matters with the Government in the usual fashion. Should a Select Committee publish a report within the relevant timeframes of the public consultation period—in a sense, that is one of the challenges we are trying to get at here: not all select Committees will respond in the relevant period, therefore elongating the process by which the reflective amendment needs to take place—the Government will obviously take those views into account before the updated statement is laid before the House in the usual manner.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    As hon. Members will be aware, last week the Government announced that we will reform the pre-application stage for nationally significant infrastructure projects to remove the statutory requirement for applicants to consult. Although the Government are committed to consultation and the value that early and constructive engagement plays in developing high-quality infrastructure schemes, feedback on Second Reading and since the Bill’s introduction has shown that the status quo is not working. Evidence indicates that the statutory requirements, which are unique to the NSIP regime and not found in any other planning consenting regime, are now creating perverse incentives. Rather than driving better outcomes and improving infrastructure applications, statutory pre-application procedures have become a tick-box exercise that encourages risk aversion and gold plating. The result is that communities suffer from consultation fatigue and confusion, with them having to cope with longer, ever-more technical and less accessible documentation. The arrangement also actively disincentivises improvements to applications, even if they are in the local community’s interests, because applicants worry that any change will require further repeat consultation and added delay to the process. As the Deputy Prime Minister and I set out on Second Reading, we would not hesitate to act boldly if a compelling case for change was made, to ensure that the NSIP regime is firing on all cylinders to deliver on our ambition for building the homes and infrastructure needed to grow our economy.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Third sitting) · Hansard source
    More

    I thank my hon. Friend for that point, and I completely agree with him. The system was set up with very specific objectives in mind. It was created initially without a role for Ministers. That was addressed by the Localism Act 2011, but the statutory pre-consultation requirements were kept in place on the basis that they were helping to improve applications prior to submission. However, according to lots of the evidence we have received in response to our working paper on the subject, the feedback from external stakeholders and the calls on Second Reading for us to look again at this specific area, the statutory requirements are now driving perverse and often bad outcomes, including for the communities affected by them. Last week, I made a written ministerial statement explaining the changes that the Government intend to make. We are tabling a clean package of amendments to implement these reforms through the Bill. The amendments fall into three broad categories. First, new clause 44 will remove the relevant sections of the Planning Act to give this change effect. That includes removing the sections that require applicants to consult local authorities, landowners, statutory consultees and local communities before submitting applications for development consent. It will also remove from the Act definitions for those groups.

  • 24 Apr 2025 · Planning and Infrastructure Bill (First sitting) · Hansard source
    More

    Q Thank you both for your time this morning. I also wanted to ask you about the nationally significant infrastructure projects regime. As you know, the objective of the Bill in this area—chapter 1 of part 1—is to provide for a more certain regime, but also to speed up the process through which applications are taken, because we have seen, as you are both aware, a deterioration in the performance of the system over recent years. We have done a huge amount of consultation on this legislation—statutory consultations, working papers, calls for evidence—but we are still very much in listening mode on whether any further changes are required. I want to get your views, picking up on the comments that you just made. In terms of the critical barriers to bringing forward major economic infrastructure, where do you think the Bill gets things right, and where does it not go far enough? Sir John Armitt: The Bill seeks, to a large extent, to provide a regime of compensation to offset where people are going to be affected. That, in a sense, is no different from what we have seen in the housing sector in section 106, for example, for a very long time. The real challenge here is the ability of the process to actually slow things down. We know that judicial review is one of the big difficulties in this area. You could argue that the recent recommendations made for judicial review do not go that far. The only way in which it can be held back is where the court decides that the issue being raised is, perhaps not frivolous, but immaterial. But I would imagine that the nature of the legal system is such that people will find ways around that. Judicial review constantly acts as a brake, and influences those who are developing projects to try to cross that bridge before they get there: you put in more mitigation than ideally you would wish, which raises the cost, and you potentially finish up with a more expensive project than ideally you would have had. That is the nature of people trying to second-guess what is going to be raised and how the judicial review will be handled. I am not sure that the recommendations will go far enough to have a serious impact on that aspect, which is one of the central aspects of what has been holding up these schemes quite significantly. Each year of judicial review is likely to potentially add a year to the process, and that is why it is difficult to see that these changes will benefit the overall process by more than six to 12 months, at the end of the day. Robbie and I were talking about this before we came in; he is more of an expert in it, so I will turn to him for any other observations. Robbie Owen: Minister, I absolutely support what is already in the Bill. I think that every provision on national infrastructure planning is appropriate, including what I hope will be added to the Bill through the amendments that you tabled yesterday, in relation to pre-application consultation and some other measures. As you say, those are all good measures that have followed extensive consultation and engagement. There are two areas where I believe the Bill needs to go further, be bolder and be strengthened. The first relates to the further streamlining of the development consent order process. That should focus on allowing the standard process to be varied, on a case-by-case basis, where there is justification for doing so. That was trailed in your planning working paper in January; I encourage you and your officials to have another look at that, because there is a justification for giving some degree of flexibility to reflect the nature and requirements of individual projects and how the standard process might need to be adapted to them. Secondly, we need to look again at the ability of the DCO process to be a one-stop shop for all the consents you need for construction of these big projects—that was the original intention back in 2008. All the discussions around that have yet to fully come to a conclusion. I note the review by Dan Corry, published a couple of weeks ago, but I do not think that it provides a full answer to allowing development consent orders to do more than they have been doing in practice, in terms of all these subsidiary consents, which, beyond the development consent order itself, are quite important for some of these big projects. The other area where the Bill should and could go further relates to the whole area of judicial review. The changes that were announced in January, following the call for evidence off the back of the Banner review, are not particularly significant. They are really quite modest, and relate largely to the permission stage of judicial review. Approximately 70% of judicial review applications get permission and go forward, therefore we need to focus beyond the permission stage. There are two other areas where the Bill could make some worthwhile changes. The first relates to the interaction between judicial review and national policy statements. As you will know, national policy statements are approved by Parliament, and the Bill contains some proposals to change that process. It has always struck me as strange that national policy statements can nevertheless still be, and are, judicially reviewed. The final point on judicial review is that Parliament should be able, if it wishes, to use a simple one-clause Bill to confirm decisions to give development consent for projects of a critical national priority. This used to be the case: we used to have lots of provisional order confirmation Bills. I think that is a very good way for Parliament, where it wishes, to express its support for a big, critical project. That could easily be done through some amendments to the Bill.

  • 24 Apr 2025 · Planning and Infrastructure Bill (First sitting) · Hansard source
    More

    Q Marian, thank you for giving your time today and for the work that you and the organisation are doing to ensure that the new system will be operational shortly after the Bill gets Royal Assent. Can I get you on the record in terms of the objectives of part 3 of the Bill? Is Natural England confident that the nature restoration fund will deliver better outcomes for the environment than the status quo? Specifically on the powers that will be available to Natural England in bringing forth EDPs, do you think the Bill gives you enough flexibility to consider a wide enough range of conservation measures to deliver those plans? Marian Spain: We are confident that this will be an improvement on the current system. We have already run versions of the nature recovery fund for recreational impact, for great crested newts and for nutrient mitigation, so we have seen enough that these schemes can work. We are confident that they will work. We are also clear that it is an improvement because at the moment the current arrangements are sub-optimal for developers and for nature. We see that developers are investing disproportionate amounts of time on data gathering that could be better done once and centrally. We see that investment in mitigation and compensation in the sequential scheme slows things down and does not always create the biggest impact. We also see that there is less transparency than the public and indeed developers themselves sometimes want about how the money is being spent. We are confident this will be an improvement. The other important point to note is that many of the pressures nature is facing now, particularly water quality, air quality and recreation, are diffuse. They are not specific. They are widespread. They are cumulative. It is impossible for an individual developer to adequately consider, mitigate and compensate. We need to do that at much more of a scale. We think the measures in the Bill and the associated measures of having more robust spatial development strategies that look at nature and development together, and of having the plan up front that tells us what the impact will be and how to mitigate it, and then the fund to allow that discharge, is a major step forward. It is unknown—well, it is not unknown, forgive me. It is a risk, of course, and people will be concerned that it will not be regressive and that it will not be a step back, but we think there are enough measures in the Bill that are clear that this is about improvements to nature—maintaining the current protections, but also allowing development to make its adequate contribution to restoration of nature.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q The Bill will mandate it, so I am asking you what you think is the most effective design for the national scheme of delegation that we intend to introduce. It is perfectly fine if you do not want it, but I am trying to get to that, given that we are intending to introduce it. Councillor Hug: I think there should be a common core. I am not quite sure how the mayoralties and others will feed into responding to particular issues around the urban and rural geographies. I think there should be a basic common core to this. Looking at how it might operate, again, I am coming from an authority that has only 3% going to committees—all told, it is about 1.4%, if you include all the advertising and listed building concerns that get through. A very small amount go through, so there is a lot of good practice happening already. In terms of how that works, one of the things that we want to ensure that we do not lose is the ability, for example if a scheme is likely to be rejected by officers, to put that to a committee that might come to a more pragmatic decision than just a rigid response based on policy. There are some other things, such as we want to ensure that there are opportunities for councils to go beyond the scheme of delegations; if there was a nationally set thing, you want to make sure that it is not just a cap on what is delegated. I think that some flexibility around urban and rural, and working with local authorities about the design of the specific scheme, would be good. It is clear that they will want as much guidance as possible about the types of things that the Government are wanting to see happen. Obviously, from our perspective we understand the point about the centrality of getting the local plans and making them as robust as possible to give people clarity about what goes on in future. The challenge comes when quite a lot of schemes come forward that are not in full compliance with policy, because the real world is messy and things have to be traded off against each other. The question is basically to what extent can those trade-offs be dealt with at office level versus at committee. That is why we want to get into the details of that with you, to make it work effectively.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q In some cases, an astronomical value. Rachel Hallos: Ultimately, it is a person’s life and livelihood. They are going to get paid only the basic agricultural value, out of no fault of their own, and they have to start up elsewhere. This is not going to happen just once or twice; if we follow the huge infrastructure plans that we all know the country needs—we accept as a union that we need to grow—this will inflate land prices elsewhere, as people choose to continue their livelihoods elsewhere and go looking for that land. That is the difference.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q Thank you, Catherine, for giving up your time this afternoon. I have two questions on the NSIP regime and development consent orders, which is your specialism. First, you will have seen that the Government tabled a series of amendments yesterday to remove the statutory requirement to consult as part of the pre-application stage. Could you give us your sense of the impact you think that will have on the speed of the consenting process overall? What do you broadly expect applicants to do now that those requirements have been removed, but new statutory guidance will be introduced setting out what we expect? Is it a mature enough system now that we can expect most applicants to still consult and engage meaningfully, and what are the incentives at play there to ensure that they will? Secondly, on the broad ambition to provide for a faster and more certain consenting NSIP process, do you think there is anything that we are missing here that we should still look at? Catherine Howard: I hugely welcome the change that was made yesterday, in terms of speeding up and cutting out unnecessary bureaucracy that helped no one, except for helping professionals like me to spend more time and gain more fees out of our clients. There is, as we just talked about, a lack of enough professionals in the whole industry to staff the system. The Government’s ambition is to triple the rate of DCO consenting to get 150 DCOs through in this Parliament. We cannot magic up more comms consultants, lawyers, environmental impact assessment consultants and planning consultants in that period, so we desperately need a way to apply those professionals most efficiently in a really focused way across all the projects we need. I have seen it in my career, having consented a number of projects since 2008, when the regime came in. Without the law changing at all, custom and practice has built up gold plating and precedent to slow the system down hugely. That is particularly true for the pre-app process, which I think the Government’s stats say has gone from an average of 14 months in 2008 to 27 months a few years ago—I suspect it is even longer now. I have seen more and more rounds of consultation on small changes. I have seen developers not putting through other changes that would be really beneficial and that communities or statutory consultees want, because they would have to have a three, four or six-month delay to do more consultation on the change. I think the cart is before the horse. It has become a very clunky and bureaucratic legalistic process, rather than what planning should be and is in all other regimes—town and country planning, and even hybrid bills—where you have more latitude to change your mind, do some lighter-touch consultation if appropriate and do some focused consultation with the key statutory consultees on the key issues, rather than producing these huge preliminary environmental information reports, which are incredibly daunting and time-consuming for everyone to read. The public sector, local authorities, regulators and the public are feeling overwhelmed by the amount of information that is put out there, which is ultimately just a form of legal box-ticking without the laser focus that you really need on key issues, so I hugely welcome the change. I was with an international investor yesterday who is interested in investing in a big portfolio of solar projects in the UK that have not yet been consented, and I was asked to explain the regime. The pre-app is always something I feel I have to apologise for and explain, and give the best story about how quick it might be, but it was great yesterday. They really welcome this change. I can see it being highly beneficial for investors who can shop around Europe and elsewhere, in terms of bringing development here.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q Should every small site application come before a committee? Councillor Hug: No. We had a thing where someone in a public report was saying we had only built x number of houses, but the reality was that far more homes had gone through under delegated authority than had actually gone to committee, so we were being wronged by the fact we had done that process. Councillor Clewer: But there may be some specific circumstance that creates a nuanced judgment where it absolutely should go to committee. And please do not just talk about the big projects; it is those small ones that are deeply personal to people where national policy says no, but circumstance actually says that you can get round national policy.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    That is very useful. Thank you.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q Could I ask you about the reforms in the Bill relating to planning decisions, and specifically our intention to take powers to introduce a national scheme of delegation? How do you think that could be best designed? What are the types of applications that you think should always be taken by planning committees, and which types of applications could be appropriately delegated to expert planning officers? Councillor Wright: For a start, the vast majority of planning permissions or planning applications are already decided by officers anyway in many councils—something like 97% in my authority were decided—so what exactly do you think we are now going to pass when under more pressure?

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q I want to be really clear, because this is important, given what we are asking Natural England to do. Without causing any tension between you and Marian Spain, do you disagree that, as she put it, “the Bill effectively maintains the mitigation hierarchy”? Richard Benwell: Yes, certainly at the project level. There is more of a requirement for Natural England to consider some of those circumstances at the EDP level. When it comes to specific projects, where it is all-important for the particular site or species, we think it is short-circuited. We will check in with Marian on that afterwards.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q We heard earlier from the RTPI about the variation in the quality and effectiveness of schemes of delegation at a local level. Councillor Wright: With regard to a national scheme, if it was advisory not mandatory—if there was some general advice out there that could be given as guidance —that would be better than mandating. What could be mandated for one area, when you look at super-urban areas compared with rural areas, might not be exactly the same sort of decision making that you are looking for.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q If I have understood you, I do not think we are suggesting that. We want the most important, most significant major applications to come to committee. Given the examples we have given before, should every reserved matters application come before a committee? Councillor Clewer: No.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    That is a very clear elaboration. On the Natural England point—on the mitigation hierarchy? Richard Benwell: As it stands, before a development that would have adverse effects on a protected site can go ahead, it is necessary, first, to try to avoid those harms, then to reduce those harms and only then, once all those steps have been gone through, if a project is of overriding public interest, can it go ahead with compensation in place. The Bill essentially short-circuits that process. In clause 50, there is a provision that makes it explicit that the compensatory measures set out in an EDP do not need to apply to the particular features and the particular site that is affected by a development. Once a developer has paid their levy, they can essentially disregard the provisions that are in the habitats regulations at the moment, and go straight to development. Of course, that is something we could also fix in the Bill by requiring Natural England to have confidence that development applications have sought to avoid harm before they go ahead. I think there would still be substantial and material benefits for developers from the simplicity of the process and their legal confidence, even if that requirement to avoid harm were put back in. We know there would need to be flexibility, such as on the phasing of benefits versus time, but you could still have this important principle that you should not go straight to squishing the ancient woodland, or make it easy to splat the species. You need to make sure that you try to avoid that harm first, before the development goes ahead.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q Rachel, may I press you on CPOs, because you have raised some very stark and serious concerns? Could you outline for the Committee what you understand the CPO reforms in the Bill to do? Specifically, could I ask whether you accept that we are, through the Bill, not changing the core principles of compulsory purchase and that, when it comes to removing hope value by directions, the Bill will merely extend an existing power, introduced by the previous Government, to town and parish councils? What is the great fear about what we are doing on CPOs through this legislation? Rachel Hallos: It is bigger than just this Bill on CPOs. There is a mistrust. There is a concern that people are not taking food production or agriculture seriously. This is what it is encapsulated in, but the CPO element for me is that people have felt the pain of badly delivered CPOs, through High Speed 2 in particular; other things have gone on in this country. That has lingered really heavily, so when you start mentioning compulsory purchase to any land manager or landowner, it sends shivers down their spine. We are concerned that disregarding a hope value puts landowners and farmers in that tailspin again, so where do we go from here? How do we deal with this? We have found that especially with our members and HS2—I will keep referring to HS2 because it has been an absolute nightmare, and it is still a nightmare. They are still waiting for the final, agreed payment in many cases, so that they can start getting on with their life. That is the concern when it comes to the hope value.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Q Thank you all for coming to give evidence. This is a question for Richard, but I am sure the other two witnesses have views, assuming that you share some of the concerns that have just been outlined. Richard, you will know that we do not accept that development has to come at the expense of nature. We are very much targeting a win-win solution when it comes to development and the environment. The Secretary of State for Environment, Food and Rural Affairs and I have had a huge amount of engagement with you and others in the sector to try to develop a solution that achieves that. I therefore want to drill into some of the concerns you have outlined, in two ways. First, on the introduction, you welcomed the “legal guarantee that the Nature Restoration Fund must not only compensate for damage but actually benefit protected wildlife.” But the claim today is that the Bill leaves us open to regression. Could you elaborate on how those two square together? Secondly, you have just said that you have confidence in Natural England and its leadership. Marian Spain, the chief executive officer, gave evidence earlier today. She said that the Bill effectively maintains the mitigation hierarchy, but you have just said that the Bill undermines the mitigation hierarchy. Can you clarify why you have a difference of opinion with Marian on that particular issue? Richard Benwell: Of course. On the first question, we were grateful for engagement ahead of the Bill’s publication, and we were really pleased to hear your aspirations to achieve a win-win. The question is whether the overall improvement test in clause 55(4) does what it is meant to do. The legal drafting suggests that a Secretary of State can agree an environmental delivery plan only if he is satisfied that the benefits for a protected feature “are likely” to outweigh the harm to that protected feature. That comes some way short of the high bar of legal certainty that is expected in the current habitats regulations. If you dig further into the Bill, you find that once an environmental delivery plan is in place, if there is evidence that it is not meeting the standards expected, it is up to the Secretary of State whether to withdraw the EDP and then only to take measures that he considers appropriate to remediate for any shortfall in environmental benefits that are supposed to be derived from the measures in the Bill. Both of those points leave far more leeway for a Secretary of State to undercut nature restoration compared with the current situation, especially when it can happen up to 10 years after the initial harm to nature. We have all heard of circumstances where promised offsets for supposed harm to nature never materialise or die a couple of years down the line. We think this can be fixed. We think that if you were to strengthen that requirement so that it matches the kind of legal certainty that we see in the habitats regulations, you would be in a much better position. On the positive side of the scale, if that promise to outweigh harm were a more substantive requirement to go beyond just about offsetting into real nature restoration, you start to get to the territory where this really could be a win-win. We know you will be advised by Government lawyers to minimise risk. That is what always happens, which is why Governments like to have these subjective tests. But as it stands, the level of certainty of environmental benefit that is required of an EDP up front, and that is then required of proof of delivery along the way, is less than under the current law.

  • 24 Apr 2025 · Planning and Infrastructure Bill (Second sitting) · Hansard source
    More

    Nationally significant infrastructure projects, which I do not think you have chosen to talk about. Councillor Hug: No—they are coming through very quickly. From a local authority perspective, I think the point is making sure that, if they are not formal consultees, there is some other mechanism for local authorities and others to feed into the process in a structured way to make sure that their voices are heard, even if formal statutory consultees are being reformed.