Matthew Pennycook MP: speeches 2025

748 published records · newest first.

Speeches

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    The purpose of clause 37 is to remove the need for Transport and Works Act order applicants to apply to multiple consenting authorities for separate authorisation requirements under relevant heritage regimes in England and Wales, such as listed buildings and scheduled monument consents. Instead, the clause provides for the consolidation of the application process for certain heritage authorisations, so that they can be obtained through the Transport and Works Act itself. I must make clear that it is for applicants to determine whether they want to proceed on the basis of existing arrangements, namely consulting multiple consenting authorities, or whether they want to obtain those consents through the Transport and Works Act itself, in which instance the Secretary of State for Transport would need to confirm that that could be undertaken via that route. The consents would be obtained as part of the TWA order process and the decision-making process that pertains to it. In making this change, as with other changes that we have made in this part of the Bill, we would bring the Transport and Works Act order process in line with the Planning Act 2008, which provides a one-stop shop development consent order process for major infrastructure. To ensure proper oversight is maintained throughout the amended process, applicants will still need to consult the relevant consenting authorities before applying. I commend this clause to the Committee. Schedule 2 amends the Ancient Monuments and Archaeological Areas Act 1979 and the Planning (Listed Buildings and Conservation Areas) Act 1990 as a result of the changes made by clause 37 of the Bill. As I have just set out, clause 37 enables an order under the Transport and Works Act to obtain certain consents through the Act itself, rather than requiring separate applications to each relevant consenting authority. Schedule 2 disapplies offences that would otherwise arise from proceeding without those consents or authorisations. The inclusion of this power is a prudent, practical and reasonable step to take to ensure the most efficient legal framework moving forward. I commend the schedule to the Committee.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    Clause 43 will remove the need for a section 50 street works licence when installing electric vehicle charge points on a public road, and instead allow applicants to apply for street works permits. Applying for a street works licence is costly, and it can take a long time for an application to be approved. The lengthy process of having to apply for a street works licence to install charge points on a public road is delaying the roll-out of this essential infrastructure. The licence application process has previously been identified by installers as a significant barrier to installation. The application process and associated costs for those licences also vary greatly between highway authorities. On average, each street works licence can cost between £500 and £1,000 and take 12 weeks or longer to obtain. As a result, installing apparatus can be a lengthy and costly process, hindering the efficient roll-out of electric vehicle charge point infrastructure.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    A number of points here are worth pulling out. We have just discussed on mandatory training the need to ensure that all elected members across the country who serve on committees are cognisant of planning law and other considerations to which they must adhere. I would gently press back. We know there are instances where committees take a decision on allocated sites against officer recommendation, out of line with planning law and those considerations, because it is easy to do so in certain instances—they might be responding to pressure from the gallery. I have had direct experience of that. It is deemed a cost-free decision to refuse an application on that basis, but it is not cost-free to the local authority and it introduces unnecessary cost and delay, and all the burdens that come with appeals.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I thank the hon. Gentleman for pressing those two points. I am more than happy to come back to the issue in more detail, but as a general point, a lot of further detail is yet to come post consultation and the regulations’ being laid. We will provide further detail then on some of the technical questions as to how the power will be implemented. The surcharge introduced by Government new clause 39 will provide the ability to fund the statutory consultees and other bodies that provide assistance and advice in relation to the planning application process. For example, we may wish to fund training and guidance for local planning authorities so that they can better engage with statutory consultees. However, the surcharge, which, as he rightly says, comes as an additional amount on top of the fees for processing applications, is very much intended to address the particular challenges that we are facing in terms of how statutory consultees are able to engage with the process in a timely manner, so that we get that advice up front.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    That is an interesting point. That would be a fairly extreme measure for a local authority to undertake but, if I have understood the hon. Gentleman correctly, it could drain its planning department budget, foreseeing that it would be able to set a fee at an appropriate rate to make up for that, and therefore in a sense evading the clear stipulation that we have here to ringfence planning fee charges to the provision of planning services. I will say a couple of things on that basis. As I said, local planning authorities will have to consult publicly and test their fee level. As part of that, they will have to consider the benchmarking exercise that we will undertake for the default national rate—so we will have a sense of what different local authorities are charging. However, if the hon. Gentleman will allow me, I shall go away to reflect more fully on how—as I hope is clear we have been thinking today—local authorities without the best intentions might seek to game the system.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    Clause 42 amends the Harbours Act 1964 to enable fees for processing harbour empowerment and revision orders to be levied on the basis of hours of time deployed on any particular application, rather than on the basis of average costs. This is part of a package of measures that Government are taking to strengthen performance in the handling of harbour order applications, especially in England, after a backlog built up over recent years. Relevant Departments, along with the Marine Management Organisation itself, are further addressing these challenges through various administrative initiatives alongside this provision. The clause applies to England, Scotland and Wales, consistent with the territorial extent and application of the original Harbours Act. The Bill does not determine the overall level of fees; there will be full consultation of ports before fees are altered by regulations. Provisions for the new system of setting fees will come into effect two months from Royal Assent. To ensure that fees can still accompany harbour orders before regulations are made, the provision repealing the current power to determine fees will be commenced by regulations. The new fees system will take precedence over the current system upon the commencement of this clause, meaning that there is no practical need for the previous regime to be switched off for the new fees regulations to be made. However, following discussion with the devolved Governments, a decision on the desired timing for this repeal in Scotland will be necessary. The Secretary of State would, as a routine matter, make the commencement order at a date chosen by Ministers in the devolved Government. The clause further supports the Government’s growth and clean energy missions by improving the efficiency of harbour order processing, which will support our wider objective of improving transport consenting processes. I commend it to the Committee. Question put and agreed to. Clause 42 accordingly ordered to stand part of the Bill. Clause 43 Installation of electric vehicle charge points Question proposed, That the clause stand part of the Bill.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    Clause 39 removes the requirement that exists at present for a second local authority resolution after submitting a Transport and Works Act application, making the process faster and simpler. Currently, local authorities must achieve a majority vote from their local authority members both before and after submission of an application. Key stakeholders told us during the development of the Bill that the second resolution is unnecessarily bureaucratic and causes delays. Removing it will cut red tape and speed up transport projects. This is a simple and, I hope, uncontroversial clause, and I commend it to the Committee.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I will just make this point, then I will give way for a final time. This debate has revealed a very principled difference of opinion, sincerely held, about whether it is appropriate at all to have a national scheme of delegation. I feel very strongly that, just as the Government set frameworks in other areas, it is right that we have a say on schemes of delegation that apply in local areas. I think that is right, both in terms of the outcomes that will be secured and to reduce uncertainty and risk in the system. I understand that Opposition Members feel differently and think that a national framework should not be applied. That is a perfectly reasonable view, but we disagree.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I refer back to my point: the hon. Gentleman may take the view, which is a perfectly coherent and respectable view, that a national scheme of delegation is wrong in principle. That is not the Government’s view, because we think there are significant advantages to be had from introducing greater consistency and certainty about what decisions go to a committee, so we can have a uniform approach across the country.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    But the conversation that we will have to have, because we have the numbers, is what the national scheme of delegation should incorporate, not whether we bring one forward. Three Members want to intervene. We have a few minutes left.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I would say two things in response to that, and then perhaps, Ms Jardine, in the interests of making progress on the Bill, I will happily write to the Committee to set out further details of the operation of the surcharge. First, on how the surcharge will be processed and distributed, it will, as the hon. Gentleman rightly says, be paid by the person collecting the fee to the Secretary of State in a manner and at a time prescribed by regulations, which are forthcoming. Outside the regulations, the proceeds will then be earmarked for distribution to bodies that provide advice and assistance in the planning process, including by way of consultation responses. Secondly, the question has been asked several times whether the Government have properly considered the cumulative impact of fees and charges—are we getting the fees right? We are very aware that the surcharge will increase the fees that are already out there—it is an additional levy in that sense—and that other measures in the Bill may already result in fee increases. I repeat that we are committed to consulting on the proposed rates and the type of application that this should apply to—not least to allow the development sector to fully engage with those proposals. On that basis, I think it would help the Committee if I set out later—chapter and verse—how we think both the clause and the surcharge will operate, on a very practical basis, and how local authorities can understand the Government’s intent in bringing them forward. Question put and agreed to. Clause 44 accordingly ordered to stand part of the Bill. Clause 45 Training for local planning authorities in England

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    What is there to say to that? In no way did I imply that the Mayor of London requires planning training—I think he has had extensive planning training—but the training requirement set out in this clause will apply to him, because he acts as a local planning authority in respect of applications of potential strategic importance. Likewise, it will apply to mayors of combined authorities and combined county authorities where they have functions corresponding to the Mayor of London conferred on them. The requirement will also apply to any persons authorised to act on their behalf, including, for example, deputy Mayors in London and other such figures. A mandatory requirement for training in planning matters will improve the overall decision-making process and decrease delays in delivery of much-needed homes and other crucial developments. Before I turn to amendment 152, I will address a very well made point raised by the hon. Member for Broxbourne. Through regulations, we will set out the timing of when training is required, but he asked an important question about what happens if training is not in place when a decision is required and whether that would stall the process. As he will know, local authorities have their own codes of conduct. We trust local authorities to ensure that committees are carried out in accordance with the rules and regulations set out by the clause. We are aware of the need to ensure that undue delays are not caused, so for that reason any decision reached by members who are in breach of the measure will not be invalidated, but the requirement will still apply to local authorities. We are reliant on their code of conduct to enforce it. Amendment 152 was tabled by my hon. Friend the Member for Shipley and spoken to by the hon. Member for North Herefordshire. As other hon. Members have said, it raises the excellent point that development must form an inclusive and safe environment for everyone. We wholeheartedly agree that that is of paramount importance. The national planning policy framework makes it clear that planning policies and decisions should ensure that developments create places that are safe, inclusive and accessible. We want to ensure that our mandatory training supports members of local planning authorities to make decisions properly, in accordance with the relevant planning policies, including those I have just mentioned, and other material considerations. That is why we will work closely with the sector to design the mandatory training. We do not think it is necessary to specify details of all the matters covered by mandatory training in the Bill, as to do so would be exhaustive and would pre-empt the forthcoming regulations and the further detail that I have referred to. I assure the hon. Member for North Herefordshire and my hon. Friend the Member for Shipley, who tabled the amendment, that we will consult on the content of the training to ensure that councillors are appropriately supported in making decisions in this area.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I understand why the hon. Gentleman is doing so, but he tempts me to announce the proposals that we will bring forward. I would like to do that as a package so the House can see what the Government are proposing. As I said, at that point I think some of the concerns will have been assuaged. My fourth and final point, which is the crux of this debate, is that we can have a very sensible discussion about the type of things that should or should not be in a national scheme of delegation. The shadow Minister just inadvertently went down that route, and I am happy to have that conversation. The hon. Member for Taunton and Wellington gave the game away, in a sense, when he argued that if we were just talking about a scheme of standardisation across the country, that would be fine, but a national scheme of delegation is not. We are, in a sense, talking about a standardised scheme that will ensure consistency in the system about what comes forward.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    This is an important point to try to tease out. The decision the hon. Gentleman has just referred to took place in an instance where, if I have understood him correctly, local residents took issue with the application of national policy and guidance on a planning decision. I do not think it is the position of either the Conservative party or the Liberal Democrats that national policy and guidance should not exist, and that it should all be completely localised. We may have disagreements on the spectrum, but we all recognise that national frameworks should be in place in some instances. The NPPF is a good example, as are other policies and guidance. That is why I think we should have a more rational and proportionate debate—we may disagree at the end of it—about the pros and cons of a national scheme of delegation, and, if one is in favour of it, as the Government are, what it should include. There is this idea that, at present, local authorities and local elected members can do whatever they want—that they are completely free, and their mandate gives them scope—but, no, that is not true. They are constrained in several respects. In fact, we have debated that at length in this Committee. The NSIP regime was introduced in recognition of the fact that certain applications should be determined on a national basis, not by local committees. I invite the hon. Gentleman to reflect and expand on why in this area, local discretion should be untrammelled—if I follow his argument—whereas in other areas he would rightly support the idea that national guidance and policy should be in place. He may differ with the content of that guidance, but local planning authorities are subject to frameworks and guidance that I think we all recognise should be in place.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    It does, and we think that is right. We think we should trust and empower expert planning officers. The appeals process will remain in force. I recognise the scenario the hon. Gentleman outlines. Local planning officers do not get every decision right. To gently challenge him, he is making the case for no scheme of delegation at all. Schemes of delegation are in place across the country. We are not saying that we do not trust expert planning officers to make the decisions on any applications. We trust them in lots of local authorities to make lots of decisions. As I said, 96% of applications go through planning officers. There are two issues at play here, which we will perhaps draw out in the debate. We should be honest about them. Members may reasonably take the view that there should simply be no national scheme of delegation—that providing that consistency on the basis of a uniform national arrangement is wrong in principle. If that is the case, I respect that decision. That is not the position of the Government. We think there is a case for a national scheme of delegation. Then there is the detail of what should go into that national scheme of delegation. Have we got the balance right in terms of the applications that should come before planning committees and should go to planning officers? We already trust expert planning officers to make decisions on a host of delegated applications across the country. The problem is there is huge variation in how those local schemes of delegation apply.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    The hon. Member understandably tempts me to start to specify what will be in the training, but I will not do that. Further details will be brought forward in due course, but I have certainly heard the case made by Committee members about what the training should include in respect of accessibility and other issues. Finally, Government amendment 49 is a minor and technical amendment that clarifies that members of mineral planning authorities should also undergo training in planning matters. Mineral sites deal with complex planning issues, so it is only right that members of mineral planning committees, acting on behalf of mineral planning authorities, should be included in the requirement to undergo relevant training. Along with amendments 50 and 51—which we will come to shortly—this amendment clarifies the position of mineral planning authorities for the purposes of the Bill. To be clear, we want to remove any doubt as to the requirements of the Bill with respect to the training of members of mineral planning committees, and that is what this amendment achieves. For those reasons, I humbly invite the hon. Member for North Herefordshire to withdraw amendment 152.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    On that point I should say, although I hope this was implied, that we will set out detailed processes in the regulations. We will absolutely take into account points that have been made today. I give the hon. Gentleman my undertaking that the specific issue that he raises will be fully considered as part of that process.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I welcome the considered and thoughtful contributions from hon. Members on both sides of the Committee. I will set out the purpose and effect of the clause, address amendment 152 and speak about Government amendment 49. As we heard in the contribution of the hon. Member for Hamble Valley, planning is principally a local activity, because decisions about what to build and where—although not decisions about whether to build at all—should be shaped by local people. That is why we believe that planning committees have an integral role to play in providing local democratic oversight of planning decisions. As I have said, I have been a local councillor and sat on planning committees, as have many Committee members—the hon. Gentleman just set out his experience. Planning committees are comprised of dedicated elected members, and in most instances the decisions are well informed and robust. It is, however, vital that in exercising their democratic oversight, planning committees operate as effectively as possible, focusing on those applications that require member input and not revisiting the same decisions. One of the ways we want to achieve those outcomes is by ensuring that all planning committee members receive adequate training to support their important work, which can be extremely complex when it comes to certain challenging applications. The hon. Member for Broxbourne rightly made the point that lots of local planning authorities already have some form of mandatory training in place. Data from the Planning Advisory Service suggests that more than 80% of councils do, but a percentage do not, and approaches to training vary quite widely across the country. That leads to inconsistencies in knowledge relating to planning law and in practice among planning committee members, which obviously has an impact on their ability to apply the relevant laws and policies when making planning decisions.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    The final point I will make before giving way is that, were a local authority to seek to evade that ringfencing provision by reducing the amount of resource going into its planning department—a not particularly sensible route to take—and then, potentially, it were not able or allowed to charge a fair and proportionate fee set in that regard, it would come under the usual planning performance dashboard, where the Department can look at the local authority for not providing a timely service or performing appropriately. As the hon. Gentleman knows, a set of intervention powers would be available to national Government, were that the case. It is far more likely, however, as we have heard from local authorities, that they would use the power to set local fees that reflect the cost of services, using it to bring more resource in and—generally, this is what they want to do—to start processing applications in a more timely manner than they can now.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I thank the shadow Minister for that point. In no way am I implying that in a committee meeting, the process of putting hands up on another vote is itself onerous. What are onerous are the delays that can be caused by the need simply to reaffirm a vote that has already taken place. The Government think this is a simple and proportionate change to ensure that the Transport and Works Act is modernised appropriately. As I hope the Committee saw this morning, the Transport and Works Act, which is over 30 years old, needs to be brought up to date and into line with other consenting regimes. Clause 39 deals with just another example of an element of that Act that requires addressing. All interested parties in a Transport and Works Act project will be able to make representations as they do now—the process will continue as it does now, but without the need for the second resolution. Question put and agreed to. Clause 39 accordingly ordered to stand part of the Bill. Clause 40 Extension to Scotland of certain amendments Question proposed , That the clause stand part of the Bill.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I can provide the hon. Gentleman with that assurance. In terms of enforcement, I assure the hon. Gentleman that if consent is granted under the Transport and Works Act, any breaches of marine licence will continue to be dealt with by the Marine Management Organisation. Question put and agreed to. Clause 38 accordingly ordered to stand part of the Bill. Clause 39 Authorisation of applications by local authorities Question proposed , That the clause stand part of the Bill.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I would say two things to the hon. Gentleman. First, we do think there is a corresponding benefit, because we think the change will remove a large element of risk and uncertainty in the system and ensure some very important applications are made in a more timely way. I end by inviting the shadow Minister, at the point we publish our proposals, to come back on whether we have got the balance right. I am more than happy to continue the conversation about what we take forward on the regulations. On the principle of introducing a national scheme of delegation, the Government feel very strongly that it is the right thing to do. Question put , That the amendment be made.

  • 13 May 2025 · Planning and Infrastructure Bill (Sixth sitting) · Hansard source
    More

    I think it is perfectly appropriate that we introduce a national scheme of delegation, and that we bring forward, through a regulation-making power, those details in due course. Any future Government would have to consult on changes and take them through via secondary legislation, and it would be up for scrutiny. I am tempted to comment more widely on regulation-making powers, but I gently say to Opposition Members that some of the placeholder clauses that I saw in legislation in the previous Parliament make this one seem very minor, in relative terms. We can debate that more widely, but I think our approach, both in outcomes and in a reasonable balance between democratic oversight and trusting expert local planning officers, which we all do in certain circumstances, is the right one.

  • 13 May 2025 · Planning and Infrastructure Bill (Fifth sitting) · Hansard source
    More

    Clause 27 will reduce the objection period for applications under the Highways Act 1980 from six weeks to 30 days. Such applications could be for the construction of new roads, changes to existing ones and other necessary legal orders for delivering highway infrastructure. The objection period refers to the timeframe during which interested parties can view application materials and provide comments. Reducing the objection period will speed up the consenting process without sacrificing the safeguards that are essential for the fair consideration of objections. An objection period of 30 days aligns with the relevant objection periods for other transport consenting regimes, such as the Planning Act 2008. Again, I draw the shadow Ministers’ attention to the fact that, as per the previous clauses, we intend to align the Highways Act provisions with those in other consenting regimes, to provide for a more uniform arrangement across the piece. Additionally, the clause will introduce a 10-week deadline for the Secretary of State to make decisions on these schemes and orders. Currently, there are no statutory deadlines for the decision-making stage for the relevant processes, unlike in other consenting regimes, such as the Planning Act 2008. Bringing the Highways Act into alignment with other consenting regimes will improve certainty and the efficiency of the process. The power for the Secretary of State to extend the decision deadline, if necessary, ensures flexibility in cases where additional time may be required. By shortening the objection period and setting a clear decision timeframe, the clause makes the process more predictable for all stakeholders. Faster, more predictable decisions will result in more efficient delivery of transport infrastructure projects, contributing to better transport networks. We think this change strikes the right balance between improving speed and maintaining fairness, ensuring that the process remains transparent and accountable. I commend the clause to the Committee.

  • 13 May 2025 · Planning and Infrastructure Bill (Fifth sitting) · Hansard source
    More

    I very much welcome that intervention, as will my officials, I am sure. It saves them a letter—although letters may be forthcoming in the course of debate if we require further detail on very technical points. I will just stress the point again: I think the confusion lies in the fact that section 10 orders apply only to National Highways, if the shadow Minister needs reassurance in that regard. But broadly, these are procedural changes that just allow, as I have said, the administrative burden to be transferred from the Secretary of State to National Highways.

Published records only — not a full account of an MP’s work. How we work →