  • 17 Dec 2024 · Old Oak Common Station · Hansard source
    More

    I thank the hon. Member for that intervention, and I will use the rest of my speech to do just that. My colleague the Minister for Rail has already had a meeting with a large number of MPs to discuss these issues, and he will continue to engage on precisely those points. As you will appreciate, Mr Efford, a project of the scale and significance of Old Oak Common cannot be delivered without some disruption to existing services. Our challenge to HS2 Ltd is to keep the disruption to a minimum and to support Network Rail and train operators to keep passengers moving. The next phase of work takes place this Christmas, with changes made to Great Western Railway services from 27 to 29 December. The rail industry has been working hard to prepare for the work and has invested £30 million to mitigate its impact and keep passengers moving. I will set out some of the things that that money has paid for. While some of the interventions are close to London, they are designed specifically to allow Great Western Railway passenger services during Old Oak Common works, such as electrification of the Poplars railway, which connects the Great Western main line and the west London line. That allows services to access their maintenance depot and for more Great Western Railway trains to terminate at Ealing Broadway. Investment has been made in Ealing Broadway and Reading stations so that they can provide better information to connecting passengers; in facilities at Euston to allow for the terminating Great Western Railway long-distance services, including the Penzance sleeper services; in alternative stabling for the Hitachi trains that serve Great Western Railway; and in other, similar provisions that are designed to help Great Western Railway services to continue operating during the period of disruption. During these days, some inter-city services will divert to London Euston and some will terminate at Reading or Ealing Broadway. Extensive mitigations have been progressed behind the scenes so that trains continue to be maintained and can provide services again after the works. Passenger communications are happening now to enable people to make choices about how and when they travel. I recognise the importance of providing timely passenger information to enable people to do that. The next significant blockade had been due to take place in December 2026, but this is now being re-planned to a later date by HS2 Ltd. Further detail on the future works plan will be shared as soon as it is available in the spring. Old Oak Common station is being built to enable all Great Western main line and relief line services to call at the station. This is important for future-proofing, but while all trains will be able to call, the future timetable will be under development for many years, so it is still too early to say with any certainty which trains will call there or from when, but I will come back to that in a moment. We know that many passengers from Wales and the west of England value the faster journeys into London, and will have other options, not via HS2, to travel north. The Rail Minister and I have heard from many colleagues about the concerns of their constituents, and officials are working with the industry to assess the options for calling patterns at Old Oak Common.

  • 17 Dec 2024 · Old Oak Common Station · Hansard source
    More

    I can confirm that the station is being constructed to allow all Great Western services to call, but no decision has been made on the future timetable. None the less, building the station requires realignment of the Great Western main line to curve around new platforms. Unfortunately, that means that even trains that do not stop at the station will have a small increase in journey times. I know the Rail Minister has already asked industry partners to review current plans to ensure the impact of this is minimised. I will come back to this when I answer questions from hon. Members. I also recognise that this disruption comes on top of several years of poor performance on this route. The Government are determined to reverse that trend, improve punctuality and reliability, and rebuild a railway we can once again be proud of. I do not think I can answer all of the questions that were posed during the debate, but I shall attempt to respond to a few of them. I know that my colleague the Rail Minister has met with many hon. Members to listen to their concerns, and that he is committed to finding the best possible solution that minimises disruption to services to constituencies in Wales and the west. He will continue to engage with hon. Members on this issue. A number of Members asked whether Great Western Railway services will stop at Old Oak Common and raised concerns about the impact on journey times. There will be a small but permanent journey time impact for all services passing through Old Oak Common without stopping. I recognise that that is a disbenefit to hon. Members’ constituents, and the Rail Minister has asked what more can be done to get that down from the estimated 90 seconds. The hon. Member for Cheltenham asked about increasing running through the station from 60 mph to 80 mph, and Network Rail has already begun to develop proposals. They were discussed at the last Old Oak Common programme board, which the Rail Minister attended. If some or all services are to stop at Old Oak Common—as I said, no decision has been made yet on future timetables; that is some way off—it will, of course, add further to journey times. Four to seven minutes added to journey times has been suggested. That would slow down those services but would allow for potential interchange with the Elizabeth line and access to parts of London via the Elizabeth line and the London Overground. The London Overground does not connect directly, but work has begun on Old Oak Common connectivity and a range of options are under consideration, from improved walking routes through to more material interventions. Various periods of blockade were discussed. The programme is currently under review, but there will be periods of disruption, as the hon. Member for Cheltenham set out, and those are likely to of the duration that he described or longer. As has been noted, there will be diversions to Euston when the blockades are in place, which will allow services to continue directly into central London for the many constituencies represented here today when the line between Ealing Broadway and Paddington is closed. That will add perhaps 15 to 20 minutes on to journey times. The hon. Gentleman and others asked about short-form trains. He described clearly the impact on people’s journey experience, which is totally unsatisfactory. I know that the availability of sufficient fleet is vital. I recognise the inadequacy of the situation when the trains are over capacity and I know that the Minister for Rail is working to address this. The hon. Gentleman also mentioned wi-fi. Free wi-fi is available on Great Western Railway services, but I know from my own travels that there are connectivity issues on part of the network. The Rail Minister has asked officials to explore the feasibility of a range of technology options to improve passenger connectivity on the rail network. The Department is conducting research to measure the strength of mobile phone signals along the network to fully understand where interventions are needed and the potential impacts. The hon. Gentleman rightly raised the issues of Sunday timetables and cancellations. Problems with infrastructure, fleet reliability, and train crew availability have resulted in high levels of cancellations on Sundays in recent months, and I agree that that is unacceptable. We know these issues must be addressed. They were not addressed by the previous Government and we are working to do so. Finally, the hon. Gentleman mentioned progress on the extension to the Honeybourne line active travel route in Cheltenham. I know it well, and I agree with his assessment that it would be a valuable extension. I understand that Great Western Railway, Network Rail, and Gloucestershire county council are working to progress the project, and if there is more we can do to hurry it along, I am sure the Rail Minister will be happy to do so.

  • 17 Dec 2024 · Old Oak Common Station · Hansard source
    More

    I congratulate the hon. Member for Cheltenham (Max Wilkinson) on securing this debate on the impact of Old Oak Common on rail services to Wales and the west of England. I thank all hon. Members for their contributions. This Government understand the important role the rail network plays in providing connectivity to support economic development, housing and employment growth, as well as access to jobs, public services and leisure. That is why we have made fixing Britain's railways one of our top transport priorities. We have been clear that rail services have been failing passengers for too long. Cancellations are at a 10-year high and punctuality is inconsistent across the network, so I will take no lectures from the shadow Minister, the hon. Member for Broadland and Fakenham (Jerome Mayhew). We need to improve services for passengers and deliver better value for money for the taxpayer. We have taken immediate action, such as bringing an end to the long-running pay dispute with train drivers, and Ministers continue to meet managing directors of train operators and their Network Rail counterparts to address poor performance and demand immediate action to raise standards. If the shadow Minister’s Government were in power, we would still see drivers out on strike. Just last week, the Minister for Rail met again with Great Western Railway and Network Rail to ensure that they are progressing their plans to restore reliability on the route. I will respond to the questions from the hon. Member for Cheltenham in a little while. First, I will address the subject of the debate. Old Oak Common station is a crucial enabler for the Government's growth mission. It will be not just a connection to HS2 for Birmingham and the north, but a destination in its own right, providing access to work and housing development alongside better connections to other services, including the Elizabeth line through central London, and to Heathrow airport. However, I recognise hon. Members’ concerns about the impact of the station and the construction works on rail services from Wales and the west.

  • 17 Dec 2024 · Old Oak Common Station · Hansard source
    More

    As the hon. Gentleman says, this Government are committed to increasing the number of people who walk and cycle for short journeys. If there is something that my colleagues in the Department and I can do to unblock things and get them moving, we will do it. Questions were asked about investment in Welsh railways. I assure hon. Members that the Wales Rail Board meets regularly and provides a forum for the UK and Welsh Governments to discuss matters of mutual interest. I understand the new Secretary of State is meeting the Secretary of State for Wales and the Cabinet Secretary for Transport and North Wales, Ken Skates, imminently to discuss transport in Wales. Transport Ministers regularly meet our counterparts in the devolved Governments. I will close by taking this opportunity to confirm again that the Rail Minister is working with all partners to ensure minimum disruption to travellers on the Great Western main line, both during the construction of Old Oak Common station and when it is in operation. I recognise that these are difficult issues, which hon. Members are right to raise on behalf of their constituents. I thank the hon. Member for Cheltenham and all hon. Members for their participation in this debate. I fully acknowledge and appreciate the importance of the issue to him and his constituents, and indeed to all hon. Members’ constituents. We will work to come up with a viable solution.

  • 17 Dec 2024 · Aldridge Train Station · Hansard source
    More

    It is a pleasure to serve with you in the Chair, Mr Betts. I congratulate the right hon. Member for Aldridge-Brownhills (Wendy Morton) on securing this debate about the future of Aldridge train station. I also congratulate the hon. Members for Strangford (Jim Shannon) and for Wokingham (Clive Jones), who used the opportunity to raise important issues pertinent to their constituencies. I know that the hon. Member for Wokingham would like my thoughts about extra car parking spaces at Twyford station; I regret that I shall have to ask my colleagues in the Department and perhaps my officials to write to him about that, as I had not prepared notes on Twyford for today's debate. I share the right hon. Lady’s enthusiasm for the delivery of new rail infrastructure enhancements such as a new station at Aldridge, and I recognise the wide array of transformative benefits that they can bring. Railways can create jobs, spur economic growth, promote decarbonisation via a modal shift from road to rail, and generally enhance people's quality of life by helping them to get easily from A to B. The magnificent new University station in Birmingham, which opened at the start of the year, has already facilitated millions of journeys and is a shining example of how infrastructure can transform lives and stimulate growth. That is backed by early passenger survey results, which show that nearly 90% of passengers rate the new station as “good” or “excellent”, and nearly 20% would have taken their journey by car if the new station was not there. I am sure she agrees that those are worthy goals, and she is right to advocate for the delivery of similar schemes in her constituency that can unlock such benefits. I completely understand the right hon. Lady’s vision for passenger train services serving her constituency for the first time in a long time. However, it is in that spirit of wanting to complete transformative transport enhancements that difficult decisions have been made. As she knows, in 2022 the Conservative Government allocated £1.05 billion of city region sustainable transport settlement funding to the West Midlands combined authority, or the WMCA. The money was devolved to the WMCA, led by then metro mayor Andy Street, to spend on its local transport priorities. The WMCA set out its priorities for a programme of investment, which the Department for Transport supported and which included an allocation of £30 million towards delivery of a new railway station at Aldridge. Time passed, and in July 2024 the West Midlands combined authority presented a paper to the Department outlining cost pressures across its portfolio of projects. As the right hon. Member knows, there has been significant inflation since 2022, and it is not unique to the West Midlands combined authority that cost pressures have arisen in the delivery of infrastructure projects. The cost gap presented a material risk that schemes already in construction would be left unfinished. The combined authority proposed reallocating funding that was allocated but not ringfenced from schemes not in construction, including Aldridge railway station, to those in delivery to ensure that they were completed. I am happy to share with the right hon. Member which schemes have been prioritised. The schemes that have been assisted with the funding, reallocated as she described, include Rail Package 2, which is delivering three new stations—Moseley, Kings Heath and Pineapple Road—on the Camp Hill line between Kings Norton and Birmingham New Street; the Wednesbury metro depot; certain sections of the Sprint phase two priority bus corridor; the Dudley Interchange, which is a new bus station at Dudley; and the Wednesbury to Brierley Hill metro extension and a further extension on to Merry Hill. Also included is the Birmingham Eastside metro extension, which serves Digbeth and will serve the HS2 Curzon Street station. A number of other programmes have been deferred as a result of those schemes needing to be prioritised. I can assure the right hon. Lady that while improving bus services is an important issue, including in the West Midlands, the funds are not being redirected and used for the purpose that she suggests might be the case. The West Midlands combined authority proposed retaining £3.6 million to complete important ongoing design and business case development work for Aldridge station. As the right hon. Lady knows, projects need to go through a process to secure final funding and move to delivery. At present, work is being done using that development funding to produce an outline business case for Aldridge railway station; then, a final business case will be needed. In any case, these are crucial steps to securing a decision to deliver. Work can still continue with that important development funding.

  • 17 Dec 2024 · Aldridge Train Station · Hansard source
    More

    I accept that the West Midlands combined authority had cost pressures and that it does not have sufficient funding to complete all the projects that were set out in its original plan to the timetable that was envisaged. The right hon. Lady is correct that the money has been reprogrammed to be used on other projects, but that does not mean that the railway station cannot be delivered in the future. Other deferred programmes include part of Sprint phase 2, the Hagley Road rapid transit development and the cross-city bus programme. I know that will be unwelcome news. The request was made in July this year, and in September my Department approved the West Midlands combined authority’s recommendation. I stand by that decision, although I understand the right hon. Lady’s disappointment that schemes not yet in construction, including Aldridge railway station, will not be delivered to the timescale originally planned. The £1.05 billion originally allocated by the Conservative Government to the West Midlands combined authority has not been reduced; the West Midlands combined authority has, with our approval, reallocated the way that the money is being spent so that it can finish the job on schemes that are in flight. I am confident that we are aligned on the benefits that transport enhancement can bring, and that is why we cannot afford to leave schemes unfinished. I understand the right hon. Lady’s concerns, but that is the decision that the West Midlands combined authority sought for us to take, and we have allowed it to proceed in that way. As the right hon. Lady says, the West Midlands combined authority’s portfolio of transport enhancement schemes was established and signed off under the previous West Midlands mayor and under a Conservative Government. However, cost escalations and delays to the programme also occurred during Mayor Street’s tenure, and under a Conservative Government. I am committed to ensuring that the schemes in delivery, which were named in the previous mayor’s manifesto, and which the right hon. Lady campaigned for, are delivered. I believe that with her advocacy and the leadership of the current metro mayor, Richard Parker, who I know is ambitious for the West Midlands and its transport network, the future remains bright for Aldridge railway station. With its £3.6 million of development funding, design work and business case development continue at pace. My Department is undertaking a review of the previous Administration’s spending plans, and once that is complete, we will confirm future funding allocations. By carrying out that essential pre-delivery business case and design work, the West Midlands combined authority is ensuring that Aldridge station is well placed for delivery funding, as and when more money becomes available. The right hon. Lady’s work with the West Midlands combined authority and her constituents to advocate for the scheme is the best way of ensuring that there is a strong local consensus behind it and increasing the chances of it being funded in the future, as and when funds become available. If and when Aldridge does get delivered, in combination with the new stations being built at Willenhall and Darlaston, we could see the number of stations in the Walsall area double from three to six, which is a hugely exciting prospect for her constituency and the wider region. I am ambitious for the future of Aldridge and the West Midlands, and I urge the right hon. Lady and the West Midlands combined authority to continue developing plans to ensure that we deliver better transport infrastructure, which supports economic growth, jobs, decarbonisation and improved quality of life for the travelling public of the West Midlands. Question put and agreed to.

  • 17 Dec 2024 · Aldridge Train Station · Hansard source
    More

    A number of projects are in construction, and I have spelled out precisely which ones. The West Midlands combined authority wanted to ensure that those projects would be completed and opened, as significant spending had already been put into taking those into construction. As I have set out, Aldridge railway station has not yet reached an outline business case. It is not in construction, but that development funding—the £3.6 million—will be used to develop the work and ensure that it can go forward in the future. It is not the only project that has been deferred.

  • 11 Dec 2024 · Draft Road Transport (International Passenger Services) (Amendment) Regulations 2024 · Hansard source
    More

    I beg to move, That the Committee has considered the draft Road Transport (International Passenger Services) (Amendment) Regulations 2024. It is a pleasure to see you in the Chair this afternoon, Mr Efford. The draft instrument will amend domestic legislation in Great Britain and Northern Ireland to underpin the UK’s intended ratification of the RSR—regular and special regular—protocol to the Interbus agreement. The UK’s international market access rights for bus and coach services are currently governed by two agreements: the Interbus agreement and the road passenger transport chapter of the UK-EU trade and co-operation agreement. The Interbus agreement covers occasional bus and coach services, such as one-off holiday coach tours to, from, through and between its contracting parties. The UK became a contracting party to the Interbus agreement in 2021, having previously been a member as part of the EU. In addition to the UK and the EU, there are nine other contracting parties to Interbus, including Moldova, Ukraine and certain Balkan states. The RSR protocol extends the Interbus agreement to cover regular and special regular services. Regular services are timetabled services; special regular services are timetabled services for certain groups such as schoolchildren. During the TCA negotiations, the UK and the EU agreed temporary arrangements for RSR services within the TCA to bridge the gap until the RSR protocol came into force. The RSR protocol entered into force on 1 October 2024, following ratification by the EU, Moldova and Bosnia and Herzegovina. This means that the temporary RSR provisions in the TCA will fall away after 31 March 2025. Effectively, the clock is ticking. The draft instrument will allow the continuation of RSR services between the UK and the EU from 1 April 2025 by moving the treaty basis from the TCA to the RSR protocol within domestic legislation. The UK cannot ratify the RSR protocol without that legislation in place. If we fail to do so, in January 2025 the temporary measures in the TCA will lapse, and the RSR services between the UK and the EU will not be able to continue after 31 March. Obviously we do not want that; it would be of particular concern for cross-border journeys on the island of Ireland. That is why we are acting now to introduce this legislation. I turn to the content of the draft instrument. There are five key changes to note. First, it will amend GB and Northern Ireland law by including references to the RSR protocol. These will replace references to the temporary RSR provisions in the TCA from 1 April 2025. Secondly, the draft instrument will update references so that the other market access provisions of both the Interbus agreement and the TCA concerning international bus and coach services are retained. This will ensure that the range of additional access rights between the UK and the EU remain in effect. These include the right for occasional services to transit the EU to reach non-Interbus-contracting parties such as Switzerland and, most notably, the special arrangements for cross-border services on the island of Ireland. Thirdly, the draft instrument includes updates to transfer the treaty basis from the TCA to the RSR protocol, for the authorisation process and the documentation that operators must hold to run RSR services. This will allow current processes to continue once the RSR protocol comes into force. Fourthly, the draft instrument will update existing offences and create new ones to align them with the requirements of the RSR protocol. This will enable enforcement agencies in Great Britain and Northern Ireland to continue to take action against non-compliant international operators who breach the market access requirements when driving in the UK. Finally, the draft instrument will revoke the assimilated EU regulations that governed market access arrangements for international passenger transport services in the UK while it was part of the EU. The practical effect of revoking those assimilated regulations will be the removal of existing passenger transport cabotage rights for EU operators. This means that, from 1 April 2025, EU operators will no longer be able to use EU-registered vehicles to run coach services that both start and end in the UK. That will level the playing field for UK operators who are not able to undertake cabotage in the EU, and it might create opportunities for UK operators to provide such services domestically. It will not, however, affect the special provisions for the island of Ireland, including cabotage rights for passenger transport provided under the TCA. In conclusion, the draft instrument will update Great Britain and Northern Ireland’s domestic legislation to ensure that the UK’s bus and coach operators can continue running services internationally, as they currently do, without disruption from 1 April 2025. If approved, it will also support the UK in fulfilling its international obligations under the TCA by enabling the UK’s ratification of the RSR protocol. The instrument is required now to ensure that we can ratify the RSR protocol in January to bring it into force after the temporary provisions of the TCA expire on 31 March 2025. I commend the instrument to the Committee.

  • 11 Dec 2024 · Draft Road Transport (International Passenger Services) (Amendment) Regulations 2024 · Hansard source
    More

    I thank the shadow Minister for his consideration of the draft instrument. I welcome his support. I will respond to him in writing, if I may, on the technical specifications that he mentioned. I am aware of the comments that were made when the instrument was debated in the other place; I will be meeting the DVSA shortly to ensure that it has the necessary resources in place to enforce the rules once the legislation comes into force. As I say, the draft instrument maintains the status quo for international RSR passenger transport services and for operators delivering those services between the UK and the EU. The treaty basis, however, will shift from the TCA to the RSR protocol for most types of RSR services. We will ensure that we protect the interests of UK operators in future discussions about international legislation, as will always be the case. This implementing legislation will enable the UK to ratify the RSR protocol early in 2025. This is critical to avoid any disruption to services in future. A gap would prevent RSR services from running between the UK and the EU, creating particular difficulties on the island of Ireland. I hope that the Committee has found this debate informative and that it will join me in supporting the instrument. Question put and agreed to.

  • 11 Dec 2024 · Nationally Significant Infrastructure Projects and Local Road Networks · Hansard source
    More

    I had forgotten that would happen at 7 pm. The introduction of four East West Rail passenger trains per hour on top of existing passenger and freight services would represent a significant uplift in the rail traffic passing over the level crossing. On one level, that is a benefit, including to the hon. Gentleman’s constituents, who will have those new options for connectivity and the choices that brings in jobs, education or just getting about. That is a huge advantage not just to his area, but to the country. However, I understand that it does have less welcome impacts, and he has described the severance issue in his constituency in Bicester. Indeed, the hon. Member for Thornbury and Yate (Claire Young) and the hon. Member for Surrey Heath (Dr Pinkerton), who is not in his place, took the opportunity to highlight the importance of listening to the concerns of local communities when developing national infrastructure projects and working with them to mitigate any adverse impacts. I understand the importance of trying to do that. Turning back to London Road and the level crossing, the level crossing barriers are currently closed for around 10 minutes every hour, but the closure time is expected to regularly exceed 32 minutes in the hour once all East West Rail services are operational, and the barriers could be closed for up to 12 and a half minutes of continuous downtime at a time. The impact of that would be queues half a mile long in either direction. That would have a huge impact not only on those stuck in the queue, but on air quality and broader congestion. It would cause the significant traffic disruption that the hon. Member for Bicester and Woodstock is rightly keen to avoid, creating long tailbacks, potentially through the centre of town, on a daily basis. In addition to the traffic issues that would be caused by retention of the crossing, we also have to consider the personal safety of crossing users, whether they are crossing on foot, on bicycles or other non-motorised means. Analysis undertaken by the East West Railway Company determined that the risk of collision between a train and a road user, whether through misuse of the level crossing or an accident, was simply too high with the uplift in East West Rail services. We know that level crossings are a point of vulnerability on the rail network, and safety has to be a top priority. In the view of the East West Railway Company and Network Rail, no further steps could be taken to improve the safety of the level crossing without undertaking its closure. I understand how disappointing that is to members of the hon. Gentleman’s local community. The East West Railway Company has reviewed all the possible options for the crossing, having consulted on them in 2021. Those options include a road bridge over the crossing and a road tunnel underneath it. As the East West Railway Company set out in its 2023 route upgrade announcement, providing an overbridge or an underpass presented insurmountable design, constructability and affordability challenges, and those options were not progressed. I recognise, as the hon. Gentleman said, that when the area around the station was redeveloped, I think back in 2014, there might have been an opportunity to look at different ways the crossing could have been done, but at the time there was no East West Railway Company, and perhaps there was a lack of join-up that could have been provided at that time. However, I am afraid we are 10 years on from that. The East West Railway Company did undertake to explore options to leave the road open to local traffic and develop options to retain connectivity for pedestrians, cyclists and other non-vehicle users, which would of course include mobility scooter users such as the constituent that the hon. Member referred to. Ensuring accessibility for those groups is extremely important. Since 2023, the East West Railway Company has also considered providing new road bridges crossing the railway at other locations in Bicester. I am afraid that the modelling work undertaken on the downtime of the level crossing barriers produced the results that I set out for the extended closure period, so it is deemed not appropriate to retain the level crossing for local use only. Providing road bridges in other locations in Bicester has also been ruled out on the grounds of affordability and constructability. East West Rail has provided further details of its analysis that led to those conclusions in the technical report accompanying the current non-statutory consultation. I am sure that the hon. Member is aware of that, and that his constituents and those watching either will have read that or will now go and seek it out. The options currently out for consultation of a pedestrian footbridge or underpass—they would of course be built to suitable accessibility standards to provide opportunities for cyclists and those using mobility scooters—alongside local road diversions, aim to provide the best possible balance between affordability and constructability and the needs of the local community in the hon. Member’s constituency. Both the footbridge and the underpass have been developed in the light of feedback received at and since the 2021 consultation. I assure him that there are opportunities for further design refinements to ensure that the solution meets the community’s need. I note the hon. Member’s comments about the issues that he would like to see addressed and what he believes the majority of his constituents would prefer. I assure him that the Government are listening and that I and my colleague the Rail Minister will be happy to keep in touch with him. I am sure there will be opportunity for further discussion as things progress.

  • 11 Dec 2024 · Nationally Significant Infrastructure Projects and Local Road Networks · Hansard source
    More

    I am happy to give the hon. Member that assurance, and I certainly would not disagree with the Rail Minister. I can also assure him that the proposed road diversions and any further enhancements required to minimise the impact of these diversions will be funded as part of the East West Rail project and that the local authority will not be expected to foot the bill. I have heard the representations about the importance of protecting the hon. Member’s constituents, and I know that my noble Friend Lord Hendy will have done as well. I understand that having to travel to the centre of Bicester by an alternative route is unwelcome, but initial traffic modelling has demonstrated that any journey lengthening caused by vehicle traffic taking the alternative route proposed in the consultation will still be considerably shorter than the journey time extension caused by sitting in a traffic jam at the crossing for 10 minutes and upwards. In closing, I signpost the ongoing consultation, and I invite all those with views, including the hon. Member’s constituents, to contact the East West Rail Company through the published channels before the closing date of 24 January 2025. It is so important that we listen to local people’s views and that we try to take them into account as we develop further mitigation. As I said, no final decision has been taken on which option to choose for the level crossing and future access for the local community. Feedback from the public will play a part in influencing the outcome. I would be pleased to keep in touch with the hon. Member as the position on the level crossing develops, and once again I congratulate him on securing this important debate, ensuring that his constituents’ concerns are heard in this place. Question put and agreed to.

  • 11 Dec 2024 · Nationally Significant Infrastructure Projects and Local Road Networks · Hansard source
    More

    I congratulate the hon. Member for Bicester and Woodstock (Calum Miller) on securing this debate, and I thank him for continuing to raise the issue of the London Road level crossing in his constituency. I recognise the concerns that he raises on behalf of local residents, and I appreciate the strength of those concerns—indeed, that was demonstrated by the presence of a number of his constituents today. As the hon. Member is well aware, East West Rail launched a non-statutory consultation on 14 November on its proposals for the construction of a new railway that would provide a direct service between Oxford and Cambridge for the first time since the 1960s. That will provide billions in economic growth, which can be reinvested into the economy nationally. The upshot of that is that, as he says, East West Rail is proposing the closure of the London Road level crossing in Bicester. The possibility of that was noted in the non-statutory consultation that took place in 2021. I appreciate that for constituents facing these sorts of challenges it is difficult to have that uncertainty over a long period, when they know something is coming but it is some way off and they do not know exactly how it will impact on them. The introduction of four East West Rail passenger trains per hour on top of existing passenger and freight services would represent—

  • 27 Nov 2024 · Rail Connectivity: Oxfordshire · Hansard source
    More

    I thank the hon. Member for that clarification. However, he will appreciate that £600 million —even with a significant private sector contribution —is not an insignificant amount. I understand that delivering the scheme would require funding from central Government—I guess that is the purpose of his debate—but he will also know that, as my right hon. Friend the Chancellor set out in her speech to the House on 29 July, the Government have been forced to look again at the economic inheritance left by the last Government. The Secretary of State has announced her intention to conduct a thorough review—indeed, it is ongoing—of the previous Government’s transport plans, to ensure that our transport infrastructure portfolio drives economic growth and delivers value for money for taxpayers. We are having to look at a number of schemes that are closer to deliverability within that portfolio. Decisions about individual projects will be informed by the review process and confirmed in due course. I encourage the hon. Member for Witney to continue to work with his local authorities and stakeholders to develop the proposal further. I commend his work to pursue alternative funding sources and to think in the round about how best to meet the aspirations that his constituents rightly have to improve connectivity. I again thank the hon. Member for securing this debate on rail connectivity between Witney, Carterton, Eynsham and Oxford. I fully acknowledge and appreciate the importance of the matter to him, to his constituency and his many constituents, and to those in the wider West Oxfordshire area; this Government recognise the requirement for connectivity in the region, and we stand ready to work with them to meet their aspirations. I hope that I have been able to provide some clarity on the Government’s position on being able to fund the development of such proposals currently, but I am sure we stand ready to have further discussions in the months and years ahead. Question put and agreed to.

  • 27 Nov 2024 · Rail Connectivity: Oxfordshire · Hansard source
    More

    It is a pleasure to serve under your chairmanship this afternoon, Sir Mark. I congratulate the hon. Member for Witney (Charlie Maynard) on securing this debate on railway connectivity between Witney, Carterton, Eynsham and Oxford. It is clear that he has been a passionate advocate for restoring the rail link, and I thank him for the important points that he has made and other hon. Members for their contributions. The Government recognise the significance of Oxfordshire and the wider Oxford economic region. It is a global centre for research, learning and healthcare, and one of the most productive economic regions in the UK, so continuing to invest in the region and work with those who represent it is vital. Its transport network is clearly important for providing the connectivity to support economic development, as well as planned housing and employment growth. That is why significant investments are being made in road, rail and sustainable transport improvements. As the hon. Member for Bicester and Woodstock (Calum Miller) made clear, housing and transport connectivity must go hand in hand. It is vital that the local transport authority, which knows its local area, can develop and prioritise transport investment projects that support those aspirations. The Government’s housing infrastructure fund has approved £126 million to Oxfordshire county council for its A40 smart corridor scheme, which will provide infrastructure for better bus travel, and safer walking and cycling along the A40 route between Eynsham park and ride and Oxford. That kind of multimodal approach will be really important. In addition, since 2014, £118.4 million from the Government’s local growth fund has been used by the Oxfordshire local enterprise partnership to invest in the transport network. That included £35 million to deliver the second phase of the A40 Oxford science transit scheme, demonstrating Government’s commitment to investing in this key corridor. I agree that public transport has a vital role to play in improving connectivity and relieving congestion on our road network, and the hon. Member for Witney quite rightly points out future projections and the importance of thinking for the long term to ensure we can cope with rising population in the area, and with the demand for more housing and more growth. A strategic vision for rail investment in the county was set out in the Oxfordshire rail corridor study report, which was published in 2021. It brought together the views of local stakeholders and the rail industry to assess the impacts of planned growth in Oxfordshire, and identified key investments in the rail network to deliver economic growth and meet the changing needs of the county. An early output from the rail corridor study has been the Oxford station project, which will undertake a series of investments to support new rail services into Oxford, and enable faster passenger and freight journeys. An early deliverable of the project is to widen the rail bridge over Botley Road, which has been closed since 2023 to enable a series of utilities diversions. I expect that hon. Members will be aware that Network Rail has experienced significant difficulties in delivering those works, which have had an unacceptable impact on the residents and businesses in the area—and on Members’ constituents who commute into the city, no doubt. I can only offer my sincere apologies to those affected. Network Rail has been tasked with developing a plan that enables the reopening of Botley Road, and the Rail Minister, Lord Hendy, will be meeting stakeholders and local representatives to discuss that in due course. The Oxfordshire area also benefits from connectivity through the East West Rail programme, although I appreciate that that is to the east of the city rather than to the west. At the autumn Budget, the Chancellor committed Government support to accelerate works on the Marston Vale line to deliver services between Oxford and Bedford from 2030. Let me turn to the specific subject of today’s debate: a reopening of the line linking Carterton, Witney and Eynsham to Oxford. I welcome Oxfordshire county council’s recent publication of the feasibility study into reopening the line, and recognise the local and regional benefits it sets out. It is a really good example of why this Government’s approach to how transport projects can be funded is based on local leaders and local transport authorities knowing best which projects to pursue; these bodies are best placed to decide on and take forward transport schemes that will most benefit their local areas. There are a number of significant challenges associated with the proposed reopening, the most significant of which is funding the estimated costs of £700 million to £900 million. I appreciate that the proposed scheme is described as a long-term project, but it is dependent on other projects that have not yet been funded or delivered; given the associated costs, other options for increasing connectivity in the area may present better value for money. I am sure that the hon. Member is in conversation with the county council about thinking in that way.

  • 21 Nov 2024 · Rural Bus Services · Hansard source
    More

    My hon. Friend is absolutely right to speak up for his constituents in Worcestershire, and about the difference that will be made by the funding that this Government are providing. It will ensure that his constituents have the connections that were cut off for too long under the previous Government.

  • 21 Nov 2024 · Rural Bus Services · Hansard source
    More

    I absolutely recognise the concern that arises when vital bus services are lost, which the hon. Lady mentioned. That is why, in the forthcoming buses Bill, we will explore a local network management measure that will give local transport authorities the power to ensure that cuts to local networks are made only when absolutely necessary, thus protecting people like her constituents, who relied on that vital bus service.

  • 21 Nov 2024 · Rural Bus Services · Hansard source
    More

    Fourteen years of decline in local bus services under the previous Administration has hit communities across the country hard, especially in rural areas. This Government know that buses are a lifeline, and through our upcoming buses Bill, we will give all local leaders the powers that they need to design networks that meet the needs of their communities, including measures to ensure that vital services for passengers remain running.

  • 21 Nov 2024 · Tyne Bridge Restoration · Hansard source
    More

    I thank my hon. Friend for that question —she is a great champion for her city. It is the responsibility of Newcastle city council to manage the bridge restoration project, but we encourage the council to do all it can to ensure that the restoration of this iconic bridge is completed in time for its centenary celebrations.

  • 21 Nov 2024 · Tyne Bridge Restoration · Hansard source
    More

    I thank my hon. Friend for that fantastic invitation on 2028. This Government’s manifesto was clear that we want to forge ahead with infrastructure improvements as part of our mission to kick-start economic growth. As with all schemes in the major road network programme, the Department’s contribution is fixed once the scheme is approved, and Newcastle city council was awarded over £35 million towards the total cost of the scheme. However, I absolutely commend her for championing this important project. As she says, it is one of the world’s most iconic bridges, and we are happy to keep this in mind in the context of the spending review.

  • 21 Nov 2024 · Topical Questions · Hansard source
    More

    Of course, I recognise that Branston bridge is a vital part of Staffordshire county council’s road network, linking communities and businesses in my hon. Friend’s constituency. In addition to the £500 million of maintenance funding that the Chancellor announced in the Budget, there is also £650 million of transport funding outside city regions next year. Full detail on how that funding will be allocated will be confirmed in due course.

  • 21 Nov 2024 · Topical Questions · Hansard source
    More

    I would be happy to get my officials to write to the hon. Gentleman to provide an update on discussions around those important schemes.

  • 21 Nov 2024 · Topical Questions · Hansard source
    More

    Like my hon. Friend, we are all thinking of Lord Prescott and his family today. My officials have had meetings with Northumberland county council, which is working to strengthen the case and provide further analytical work before the scheme can be fully appraised. I would be happy to update my hon. Friend on those discussions when I can do so.

  • 21 Nov 2024 · Topical Questions · Hansard source
    More

    The hon. Member raises a really important point about the disruption of roadworks. We are absolutely committed to ensuring that we mitigate those problems and deal with them exactly as he said.

  • 21 Nov 2024 · Midland Main Line Electrification · Hansard source
    More

    The electrification of the remainder of the route to Nottingham and Sheffield via Derby—the midland main line electrification programme—is in development, and currently it is planned to be completed by the early 2030s, subject to business case approvals and wider affordability considerations.

  • 21 Nov 2024 · Midland Main Line Electrification · Hansard source
    More

    We are all concerned about the impact of works on services. I know that the Rail Minister is aware of that and would welcome the opportunity to visit, alongside Network Rail, to see the work being done to mitigate the impact on the hon. Gentleman’s constituents as that work continues.